– 1 –
Unboxing
After opening the box, you will find…
◆
MetroLinq (ML
2.5
-60-35 or ML
2.5
-60-19)
◆
Bracket Kit
◆
POE Power Supply
◆
Power Cable
Tools/Items Required
◆
13 mm Socket Wrench
◆
Flat-Head Screwdriver
◆
Ethernet Cables
◆
(Optional) Alignment Scope ICC-SCOPE-9x50
For helpful training and user-case information, please go to
ignitenet.com/support
Assembly
The MetroLinq bracket is designed for wall and pole mounting
(25
mm - 75 mm pole diameter). Choose what is best for your
location and select hardware accordingly.
Power Up
Welcome to MetroLinq
Interference-Free Gigabit Wireless
Ensure all four position-locking bolts are tight before
installing.
1
Install the bracket onto MetroLinq using four M8 bolts,
lock washers, and flat washers.
Connect an Ethernet cable from the MetroLinq WAN port
(right-side RJ-45) to the POE port on the power supply.
Connect Ethernet cable from the “LAN” port on the power
supply to your LAN device.
Connect the power cord to a nearby AC power source.
2
1
2
3
MetroLinq 60
E042016-CS 15020000xxxxA R01
Q u i c k S t a r
t G u i d e
MetroLinq
2.5
Outdoor 60GHz PTP + 5 GHz
ML2.5-60-35 / ML2.5-60-19
www.ignitenet.com