background image

 

 

19 

11. Declaration of Conformity

 

 
 
 

EC conformity declaration in accordance with

 

 

EC Directive 2006/95/EC, 

 

EC Directive EMC 2004/108/EC and DIN EN 60730-1+2

 

 

We: 

 

IGEMA GmbH 
LECOS GmbH 

J.G. Merckens Mess- und 

Regelsysteme GmbH & Co.  KG 

Zieglerstraße 10-16 

D-52078  Aachen 

 

declare as the IGEMA Group that the 

product “NW water level limiter” as pressure accessory 

 

Product type: 

                                             Control device “SMLC1” with 

Electrode “EL030” or “EL19-2”  

  
 

comply with the directives and have been subjected to the following conformity-assessment 

procedure: 

 

Category IV, Modules B and D 

 

Applied standards: 

Control device: DIN EN 50081-1, DIN EN 50082-1 

Electrode/float switch: 

 TRD, AD2000 

 

Notified body for the modules: 

 

TÜV Rheinland Industrieservice GmbH 

Am Grauen Stein 

D-51105 Köln (Cologne) 

 

Identification no. 0035 

 

Aachen, 20.07.2011 

 

 

 
 
 
 
 
 
 
 
 
 

             E.H. Kilchert                               A.Scholl                              J.Riechelmann 

             (Managing director)                    (QM Officer)                        (Development)

 

 

 
 
 

 
 
 

 

Summary of Contents for SMLC 1

Page 1: ...Low water level limiter SMLC1 With level electrode EL 030 EL 19 2 D 08 B 16644 1 Edition 07 11 Installation and operating instructions...

Page 2: ...allation 8 6 Configuration 8 7 Fitting the electrode 9 11 7 1 Fixing elements for receiving electrodes 10 12 7 2 Mounting in mounting housing 12 13 7 3 Adjusting the electrode plugs 14 7 4 Shortening...

Page 3: ...ese assembly and operating instructions in the relevant language of the country must accompany it Work on the device should only be carried out by trained staff specially commissioned and exclusively...

Page 4: ...4 Exclusion of liability IGEMA GmbH Mess und Regelsysteme will assume no liability if the above mentioned regulations instructions and safety precautions are not noted and followed...

Page 5: ...ng the output of the input stage in the rhythm of 40 ms for its in phase dynamic behaviour If the behaviour is correct the timer and control unit activates the driver of the final stage with its own m...

Page 6: ...er dynamic monitoring the periodic overall test of the device takes place every 2 minutes for one second as a fully automatic process The yellow LED TEST shows that the test is being carried out follo...

Page 7: ...ng with a spring catch for the DIN EN 50022 standard 35 mm carrier rail and for screw fixing on a mounting plate 4 1 Installation dimensions and descriptions SMLC1 Base Front view Side view with conne...

Page 8: ...3 mm drill Fit base 5 on base plate with two M4 screws 6 Configuration The preset switch off time can be changed It is to be agreed with the local expert Setting the switch off time Open SMLC1 To do...

Page 9: ...lectrode shank Screw up both parts by means of the enclosed M4 set screw with SW2 hexagon socket Screwing in the electrode Release screw 1 and pull off electrode plug 2 Clean sealing surfaces and chec...

Page 10: ...ing to DIN Drilling plans 1 8 Bohrbild means drilling plan Seals according to DIN PN DN DIN Sealing surface Form Threaded hole Material 40 2635 B 63 2636 100 160 50 2638 DIN 2526 E according to drilli...

Page 11: ...0 x 100 100 160 50 976 4 M24 x 110 1 7709 40 M20 x 90 63 976 M24 x 110 1 7709 100 160 100 2510 8 LM27 x 145 Ck 35 DIN nuts PN DN DIN Numbe r Dimension Material 40 M16 63 M20 100 160 50 EN 24032 8 M24...

Page 12: ...housing The approval is only valid if shut off valves are mounted between the process connections of the mounting house and the boiler supports and a relief valve is fitted on the mounting housing Il...

Page 13: ...rocess connection M2 PN DN DIN Sealing form DIN 16 25 40 20 2635 2526 Form C 63 100 2637 160 25 2638 2526 Form E On request ASME compliant flanges weld on ends or DIN or ASME compliant socket welding...

Page 14: ...d snap in retighten the electrode plug 5 7 4 Shortening the electrode extension see sketch page 9 Never dismantle the electrode when the boiler mounting housing is pressurised Release screw 1 and pull...

Page 15: ...ing to the wiring diagram illustrated 8 1 Wiring diagram EL 030 EL 19 2 See name plate of supply voltage Safety chain Alarm Power connection Shielded connection line e g LIHF GLS 4 x min 0 75 mm Cable...

Page 16: ...is uncovered the red LED lights up FAULT When the electrode is submerged the LED FAULT must not light up The LED TEST must light up for one second every two minutes A successful test is confirmed by...

Page 17: ...osition 800 with protective tube DN 50 vertical installation position 800 with protective tube DN 50 100 installation position inclined up to 45 9 2 Maximum ratings of potential free contacts Safety c...

Page 18: ...months The condition for this is proper handling in accordance with the assembly and operating instructions For worn and replacement parts the warranty is limited to defects of material and manufactur...

Page 19: ...ressure accessory Product type Control device SMLC1 with Electrode EL030 or EL19 2 comply with the directives and have been subjected to the following conformity assessment procedure Category IV Modul...

Page 20: ...the QM System guidelines in accordance with DIN EN ISO 9001 2000 If the device supplied shows transport damage or gives cause for complaint in spite of our final quality control please contact our SER...

Reviews: