11
5. Installation
5.1 Safety Instructions
➢
Account for over pressure conditions, according with the local laws or standards.
➢
For the problems that cannot be solve with the help of this instructions, please contact the
supplier or the manufacturer.
5.2 Installation area requirements
•
The installation area should have easy access and provide enough space for maintenance
and removing operations.
•
The pipework before and after the sample cooler, must be sized in order to avoid that the
max flow speed recommended, for the fluid in question, is exceeded.
•
In order to allow installation and maintenance work without emptying the system, stop valve
should be installed upstream of the sample cooler water and steam supply.
5.3 Procedure
•
Prior to install check that the product is suitable for the intended application: materials and
pressure/temperature ratings.
•
Before installing remove plastic covers placed on flanges or connection ends. The
equipment has arrows or inlet/outlet designations. Be sure that it will be installed on the
appropriate direction.
•
Take care with jointing material to ensure that none may be permitted to block or enter the
sample cooler.
•
Sample coolers are recommended to be fitted with the centre line of the cooler in a vertical
position to ensure that the best results are obtained.
•
Stop valves are necessary on the cooling water and sample inlet.
•
The outlet cooling water should be piped into a drain and be free of obstructions or isolation
valves.
•
The sample cooler pipe work should be properly supported and free from strain and it
should not be subjected to undue surges of pressure. The start-up condition should be
considered.
Danger