background image

 

 

11 

5.  Installation 

 

5.1  Safety Instructions 

 

 

 

 

 

  Account for over pressure conditions, according with the local laws or standards. 

  For the problems that cannot be solve with the help of this instructions, please contact the 

supplier or the manufacturer. 

5.2  Installation area requirements 

 

The installation area should have easy access and provide enough space for maintenance 
and removing operations. 

 

The pipework before and after the sample cooler, must be sized in order to avoid that the 
max flow speed recommended, for the fluid in question, is exceeded. 

 

In order to allow installation and maintenance work without emptying the system, stop valve 
should be installed upstream of the sample cooler water and steam supply. 

5.3  Procedure 

 

Prior to install check that the product is suitable for the intended application: materials and 
pressure/temperature ratings. 

 

Before  installing  remove  plastic  covers  placed  on  flanges  or  connection  ends.  The 
equipment has arrows or inlet/outlet designations. Be sure that it will be installed on the 
appropriate direction. 

 

Take care with jointing material to ensure that none may be permitted to block or enter the 
sample cooler. 

 

Sample coolers are recommended to be fitted with the centre line of the cooler in a vertical 
position to ensure that the best results are obtained. 

 

Stop valves are necessary on the cooling water and sample inlet. 

 

The outlet cooling water should be piped into a drain and be free of obstructions or isolation 
valves. 

 

The sample cooler pipe work should be properly supported and free from strain and it 
should not be subjected to undue surges of pressure. The start-up condition should be 
considered. 
 

 

 

Danger 

Summary of Contents for IGEMA SC32-SC132

Page 1: ...Edition 03 2021 D 11 B 53616 EN 00 Installation and maintenance instruction IGEMA SC32 SC132 Sample cooler...

Page 2: ...e Steam is our passion and we offer you the entire programme for the safe and economic operation of your plants especially in the steam and condensate sector Please read the installation and operating...

Page 3: ...5 Exclusion of liability 8 2 Contents of the packaging 8 3 General 9 3 1 Note 9 3 2 General Safety Instructions 9 4 Transport and Storage 10 4 1 Safety instruction 10 5 Installation 11 5 1 Safety Ins...

Page 4: ...4 Table of contents cont 7 Maintenance 14 7 1 Limiting Conditions 14 8 Products returning 15 8 1 Safety Instructions 15 9 Loss of warranty 15...

Page 5: ...bove tasks IGEMA GmbH accepts no liability for damage to property or personal injury caused by unqualified persons or by failure to observe these installation and operating instructions If no sufficie...

Page 6: ...The maximum values of the pressure and temperature range of the device must be checked before installation If the maximum allowable operating values of the device are lower than those of the system on...

Page 7: ...been depressurised and that the pressure has been safely reduced to atmospheric pressure In principle no system should be regarded as unpressurized even if indicated by pressure measuring devices suc...

Page 8: ...bH the applicable safety and environmental laws according to GGVSEB German ordinance on the national and international carriage of dangerous goods by road rail and inland waterways must always be obse...

Page 9: ...solve with the help of this instructions please contact the supplier or the manufacturer The manufacturer reserves the right to change the design and material of this product without notice 3 2 Gener...

Page 10: ...rotective measures against dirt Correct installation of the equipment is full responsibility of the contractor Sample coolers are designed to be applied in places protected from exposure to weather We...

Page 11: ...ior to install check that the product is suitable for the intended application materials and pressure temperature ratings Before installing remove plastic covers placed on flanges or connection ends T...

Page 12: ...12 5 4 Dimensions Pos Description Sample cooler 1 Sample intake 2 Cooling water intake 2a Colling water valve 3 Draining connection 4 Funnel to take a measuring jug 5 Sample outlet 5a Thermometer unit...

Page 13: ...wing must be checked All works are completed The sample cooler is correctly installed All the necessary safety devices have been installed At start up the presence of small particles in the fluid dirt...

Page 14: ...ly after a small period of time in order to condense or cool the remaining steam inside the sample cooler 6 3 Periodical checking 24 hours after the start up it is recommended to check the pipe connec...

Page 15: ...bstances identified as hazardous or potentially hazardous must be provided with the information mentioned above 9 Loss of warranty LOSS OF WARRANTY Total or partial disregard of above instructions inv...

Page 16: ...16 Antwerpener Str 1 Fon 49 2501 92424 0 48163 M nster Fax 49 2501 92424 99 Deutschland info igema com www igema com IGEMA GmbH...

Reviews: