Igema IGEMA SC32-SC132 Installation And Maintenance  Instruction Download Page 5

 

 

1.  Important safety instructions 

KEEP THESE INSTALLATION AND OPERATING INSTRUCTIONS IN A SAFE PLACE! 

Commissioning as well as maintenance and repair work may only be carried out by qualified 
persons  in  compliance  with  the  installation  instructions  given  in  this  operating  manual.  The 
correct installation, commissioning, maintenance and operation of the device presupposes that 
the person in charge is familiar with measurement and control systems and complies with the 
general installation and safety instructions. In addition, the correct and intended use of tools 
and the handling of safety devices must be ensured. Unqualified persons must not be assigned 
the above tasks!  

IGEMA  GmbH  accepts  no  liability  for  damage  to  property  or  personal  injury  caused  by 
unqualified persons or by failure to observe these installation and operating instructions. If no 
sufficiently  qualified  person  can  be  found,  IGEMA  GmbH  can  be  commissioned  with  the 
installation/maintenance. 

1.1  Symbols used in these instructions 

In the following installation and operating instructions, safety instructions are marked with the 
following symbols: 

 

 

Danger 

This symbol and signal word refer to a potentially 
hazardous situation which could result in death or 
injuries if ignored. 

 

Caution electrical voltage 

This  symbol  and  signal  word  indicate  live  parts 
with an immediate danger of death from electric 
shock. 

 

Caution hot 

This  symbol  with  a  signal  word  indicates  a 
potentially hazardous situation that can result in 
severe burns and scalds all over the body. 

 

 

Summary of Contents for IGEMA SC32-SC132

Page 1: ...Edition 03 2021 D 11 B 53616 EN 00 Installation and maintenance instruction IGEMA SC32 SC132 Sample cooler...

Page 2: ...e Steam is our passion and we offer you the entire programme for the safe and economic operation of your plants especially in the steam and condensate sector Please read the installation and operating...

Page 3: ...5 Exclusion of liability 8 2 Contents of the packaging 8 3 General 9 3 1 Note 9 3 2 General Safety Instructions 9 4 Transport and Storage 10 4 1 Safety instruction 10 5 Installation 11 5 1 Safety Ins...

Page 4: ...4 Table of contents cont 7 Maintenance 14 7 1 Limiting Conditions 14 8 Products returning 15 8 1 Safety Instructions 15 9 Loss of warranty 15...

Page 5: ...bove tasks IGEMA GmbH accepts no liability for damage to property or personal injury caused by unqualified persons or by failure to observe these installation and operating instructions If no sufficie...

Page 6: ...The maximum values of the pressure and temperature range of the device must be checked before installation If the maximum allowable operating values of the device are lower than those of the system on...

Page 7: ...been depressurised and that the pressure has been safely reduced to atmospheric pressure In principle no system should be regarded as unpressurized even if indicated by pressure measuring devices suc...

Page 8: ...bH the applicable safety and environmental laws according to GGVSEB German ordinance on the national and international carriage of dangerous goods by road rail and inland waterways must always be obse...

Page 9: ...solve with the help of this instructions please contact the supplier or the manufacturer The manufacturer reserves the right to change the design and material of this product without notice 3 2 Gener...

Page 10: ...rotective measures against dirt Correct installation of the equipment is full responsibility of the contractor Sample coolers are designed to be applied in places protected from exposure to weather We...

Page 11: ...ior to install check that the product is suitable for the intended application materials and pressure temperature ratings Before installing remove plastic covers placed on flanges or connection ends T...

Page 12: ...12 5 4 Dimensions Pos Description Sample cooler 1 Sample intake 2 Cooling water intake 2a Colling water valve 3 Draining connection 4 Funnel to take a measuring jug 5 Sample outlet 5a Thermometer unit...

Page 13: ...wing must be checked All works are completed The sample cooler is correctly installed All the necessary safety devices have been installed At start up the presence of small particles in the fluid dirt...

Page 14: ...ly after a small period of time in order to condense or cool the remaining steam inside the sample cooler 6 3 Periodical checking 24 hours after the start up it is recommended to check the pipe connec...

Page 15: ...bstances identified as hazardous or potentially hazardous must be provided with the information mentioned above 9 Loss of warranty LOSS OF WARRANTY Total or partial disregard of above instructions inv...

Page 16: ...16 Antwerpener Str 1 Fon 49 2501 92424 0 48163 M nster Fax 49 2501 92424 99 Deutschland info igema com www igema com IGEMA GmbH...

Reviews: