MC352-4P-2S-V2 User Manual
13
4. Please refer to the following procedure t
o remove the Industrial PoE+ Switch from
the track.
Mounting the Wall-mount Plate
To install the
Industrial PoE+ Switch
on the wall:
1. Loosen the screws to remove the
DIN rail
bracket from the
Industrial PoE+ Switch
.
2. Place the wall-
mount plate on the rear panel of the Industrial PoE+
Switch.
3. Use the screws to attach the wall-
mount plate on the Industrial PoE+ Switch.
4. Use the hook holes at the corners of the wall-
mount plate to hang the Industrial
PoE+ Switch on the wall.
5. To remove the wall-mount plate, reverse the steps above.