Electronic level sensor
LR7009
19
6 Electrical connection
The device must be connected by a qualified electrician.
The national and international regulations for the installation of electrical equipment must be
adhered to.
Supply voltage SELV, PELV according to the technical data sheet.
u
Disconnect power.
u
Connect the device as follows:
When the device is supplied with operating voltage for the first time, the probe length, the
medium to be detected and the type of probe used must be entered. Only then is the device
ready for operation.
L
1 BN
2 WH
4 BK
3 BU
OUT1/IO-Link
OUT2
L+
4
3
2
1
Pin
Core colour
1:
BN
brown
2:
WH
white
3:
BU
blue
4:
BK
black
OUT1:
• Switching output
• IO-Link
OUT2:
• Switching output
Colours to DIN EN 60947-5-2