48
5
ADJUSTMENTS AND SETTING-UP
302.034
5.2.1 Feeding chain - Adjustment
•
Remove the guards
A
and
B
.
•
Loosen the screws
C
and
D
.
•
Stretch the chain
E
through the screws
F
and tighten
the screws
C
again.
•
Stretch the chain
G
by pressing the support
H
in the
direction of the arrow and tighten the screws
D
.
•
Replace the guards that had previously been re-
moved.
5.2.2 Drive chains - Adjustment
•
Remove the drive system
guard.
•
Loosen the screws
A
, stretch the primary chain
B
by
pressing the support
C
in the direction of the arrow
then tighten the screws
A
again.
•
Loosen the screws
D
, stretch the secondary chain
E
by pressing the support
F
in the direction of the arrow
then tighten the screws
D
.
•
Replace the guard that had previously been removed.
34.064 Ec. 0
B
A
34.065 Ec. 0
C
D
F
G
E
H
34.120 Ec. 0
34.066 Ec. 0
F
D
B
E
A
C
Summary of Contents for BOSS 542 CNC
Page 102: ...100 9 302 034 ...
Page 107: ...2 302 035 ...
Page 165: ...60 3 OPERATION INFORMATION 302 035 ...
Page 167: ...62 302 035 3 ...