Modular Hi-Rise Replacement Series – MIY
INSTALLATION, OPERATION, & MAINTENANCE MANUAL
25
SECTION SIX — Checklists
Receiving and Inspection
Unit received undamaged
Unit received complete as ordered
“Furnish only” parts accounted for
Unit arrangement/hand correct
Unit structural support complete and correct
Handling and Installation
Unit mounted level and square
Proper access provided for unit and accessories
Proper electrical service provided
Proper overcurrent protection provided
Proper service switch/disconnect provided
Proper chilled water line size to unit
Proper hot water line size to unit
All services to unit in code compliance
All shipping screws and braces removed
Unit protected from dirt and foreign matter
Cooling/Heating Connections
Protect valve package components from heat
Piping connected to unit
Pressure test all piping for leaks
Install drain line and traps, as required
Insulate all piping, as required
Risers have been connected to unit coil valve
package
Ductwork Connections
Install ductwork, fittings and grilles, as required
Flexible duct connections at unit
Proper supply and return grille type and size
Control outside air for freeze protection
Insulate all ductwork, as required
Electrical Conditions
Refer to unit wiring diagram
Incoming power service or services are connected
Install and connect “furnish only” parts which
have not been factory installed
Unit Start-Up
General visual unit and system inspection
Check for proper fan rotation
Record electrical supply voltage
Check all wiring for secure connections
Close all unit isolation valves
Flush water systems
Fill systems with water/refrigerant
Vent water systems, as required
All ductwork and grilles in place
All unit panels and filters in place
Start fans, pumps, chillers, etc.
Check for overload conditions of all units
Check all ductwork and units for air leaks
Balance water systems, as required
Balance air systems, as required
Record all final settings for future use
Check piping and ductwall for vibration
Check all dampers for proper operation
Verify proper cooling operation
Verify proper heating operation
Reinstall all covers and access panels
Verify proper condensate drainage
Recommended Spare Parts (per 10 units)
Circuit Breaker
3-speed relay board (if not proportional)
Motorized Control Valve Body and Actuator
Blower Deck Assembly (Quick Swap)
Motor-blower Assembly
Electric Heater Assembly
Heater Limit Switch
Low Volt Control Fuse and Holder
Condensate Float Switch
Hose Kit (24” hoses)
Transformer
Relays (Standard and/or Solid State)
Supply and Return Combo Valves
Filters (1/unit)
Primary Control Door Assembly (Quick Swap)
Line Volt Control Door Assembly (Quick Swap,
if present)
Coil Assembly (Quick Swap)