Modular Hi-Rise Replacement Series – MIY
INSTALLATION, OPERATION, & MAINTENANCE MANUAL
13
SECTION TWO — Product Line Specific Demolition & Installation, Cont’d.
Figure 4. Top Opening
24. If there is a side/front supply, install the supply
air grille(s) into the painted, top supply-grille
transition panel (Figure 6). For top supply only,
install the painted top blank-off panel instead
(Figure 5).
Figure 5. Top Blank-off Panel
Figure 6. Top Supply Grille Transition Panel
25. Attach the louvered, return-air deco panel to the
new chassis, using both of the 5/16” hex cam-
locks.
26. Installation complete. Clean up work area.
Submittals and product literature detailing unit operation,
controls, and connections should be thoroughly reviewed
BEFORE beginning the connection and testing of risers
and piping.
To assure optimal unit performance, the supply
connection(s) are marked on the unit’s coil with an “S”
meaning supply or inlet and “R” meaning return or outlet
indicating flow direction to and from the coil. Blue letters
mark the chilled water connections and red letters mark
the hot water connections.