Setting Changes
p.42
Output Test allows you to test the output ports of the RFK505. To begin the test, press <ENT>
. First, output port 1 and 2 will be tested. During the test, relay outputs are activated and yo
u will hear Tick-Tack sounds with the green LED blinking twice. Second, output ports3 and 4
will be tested. During the test, TTL outputs are activated and the yellow LED blinks twice. Yo
u can check the voltage level of the TTL outputs with appropriate test equipment.
Lastly, output port 5 will be tested. During the test, you will hear 2 beeps. After all the tests
are over, press any key to exit.
4.4
LCD Test
LCD Test allows you to test the LCD of the RFK505. To begin the test, press <ENT>. Once the
test begins, the LCD will display a series of different screens.
Ensure that all the screens on the LCD are properly displayed. The test ends with the display
of the firmware update date (YYYY/MM/DD). After the test is finished, press any key to exit.
4.5
키 패드 테스트
Keypad Test allows you to test the keys on the keypad. To begin the test, press <ENT>. Press
each key on the keypad, then the number or letter that corresponds to the key pressed will d
isappear from the screen. After all the keys are pressed, the LCD displays the “TEST PASSED”
message.
Letter A corresponds to <ESC>, B to <ENT>, C to <F1>, D to <F2>, E to <F3>, and F
to <F4>.
Summary of Contents for IDTECK SRK505
Page 1: ......
Page 22: ...Installation Checkpoints Tips p 18 ...
Page 44: ...Setting Changes p 40 4 NOT USE 4 1 Firmware Version ...