FIRST ArcSAR SETUP
IDS GeoRadar S.r.l.
Confidential Information - Do Not Distribute
MNG/2017/0016 Rev 1.0 27/ 78
1.
Remove the mudguards from the Trailer (use two 13 mm wrenches).
Every mudguard has 4 fixing screws (two screws for each side);
Fig. 44 – Mudguards fixing screws
2.
after the mudguards removal, the 16 Trailer holes (4 holes for each
side) become well visible;
Fig. 45 – Holes on the Trailer
3.
install the Supply Unit on the Trailer for first. In this way the right
balance of the trailer is ensured. If you look close to the forks guides,
you can see a pierced frame close to every guide: every frame has a
grid of holes to install the trailer fixing plates;
Fig. 46 – Detail of Supply Unit bottom
4.
lift the Supply Unit with the forklift, inserting the forks into the
specific guides placed at the bottom side. It is recommended to lift
the Supply Unit from the heaviest side of the Supply Unit (generator
and battery side)