15
PRELIMINARY
ACTIVITIES
Make sure that the tank 50 L(E) is loaded (please note that 380 drives are guaranteed with the 50 liter tank)
1. Give power to the main switch (D) by setting it to ON.
2. Act on the pump module switch (C) and turn it to the ON position, at this point the pump module starts.
3. System in operation with timer and photocell sensor active.
4. To turn off the system, act on the control panel of the pumping module by pressing the ON / OFF switch.
OUTPUT AP
(SLIP LOCK connection 3/8 “pipe)
ARC LINE
WARNINGS!
- The system performed for 10 seconds after activation.
- The system is equipped with a tank level monitoring system.
- In case of lack of product the pump stops automatically.
D
ON
C
E
Prog
.
Descrizione
1
FRAME
2
WATER SUPPLY KIT
3
AP OUTLET WITH AP WATER FILTER
4
CONTROL PANEL
5
SWITCH ON/OFF
6
COVER
7
PHOTOCELL KIT CONNECTOR
4
5
2
3
7
1
6
5 - UNPACKING AND INSTALLATION
Summary of Contents for Adi
Page 30: ...30 NOTES ...
Page 31: ...31 NOTES ...