idomus IDO PRO (HL) Mounting, Operation And Maintenance Instructions Download Page 4

4

Dear

  C

ustomer

,  thank  you  for  purchasing  our  product. 

We assure you that properly operated

 door

 will impeccably serve 

you for a long time.

CONTENT

1. 

Regarding this instruction

1.1 

Marking

2. 

Safety instructions

3. 

Mounting

4. 

Operation and environmental conditions

4.1 

Cleaning

4.2 

Control

5. 

Door maintenance and technical maintenance 

6. 

Malfunctions and elimination of defects 

7. 

Dismantling of door

8. 

Documentation

9. 

Disposal

1. 

REGARDING THIS INSTRUCTION

This instruction was prepared in accordance to EC Directive 2006/42/
EC.  The  instructions  for  mounting,  operating,  maintenance  and 
dismantling the IDO-

PRO

 (

HL)

 doors are provided herein.  Carefully 

read this instruction and adhere to all of its requirements. Important 
information  about  the  product  is  submitted  herein.  Especially 
adhere to the safety and warning instructions. In the event of doubts 
regarding mounting and/or maintenance, contact UAB “IDOMUS”.

This  instruction  may  be  supplemented  with  other 

instructions, for example, instruction for mounting passage doors or 
electric automatic gear (if applicable).

All of the measurements are provided in millimeters, save 

for those cases when indicated otherwise.

After  mounting  the  doors,  please  ensure  that  the  door’s 

marking sticker “CE” is fi lled-out and sturdy glued to the doors.

Please keep this instruction in a safe place, near the doors.

Technical changes may be possible due to continuous development 
of products.

2. 

SAFETY INSTRUCTIONS 

• Only a qualifi

fied

 specialist (a competent person according to EN 

12635) may perform the mounting, technical maintenance, repair 
and dismantling works of the sectional garage doors.  
• 

In  the  event  of  door  malfunctions  (if  the  movement  is 

diffi  cult or other malfunctions exist), for the inspection and repair of 
them you must address a qualifi

ed

 specialist.

• 

The quali

fied

 specialist must adhere to the 

requirements national  laws  regarding  work  safety.  When 
performing  mounting works, it is necessary to pay attention to 
possible threats 

defined

 in EN 12604 and EN 12453.

• 

Prior to starting door operation, you must check whether 

the doors are off an impeccable mechanical condition and/or their 
balance  has  been  maintained,  in  order  to  manually  control  them 
easily (as EN 12604 requires). Do not operate the doors, if damages 
are clearly visible. 
• EN 13241-1 defi nes the use area of IDO-

PRO

 (

HL

) sectional doors.

3. 

MOUNTING

Prior to starting the mounting works, carefully read all of the warning 

and  instructions  contained  herein  in  order  to  avoid  any  personal 

injuries.  Perform  the  mounting  works  only  in  accordance  to  the 

procedure indicated herein, by having regard to these points:

• Prior to mounting the doors, check whether the door opening is 

properly prepared and the building’s fl

oors

 are bright enough;

• 

For  the  duration  of  electrical  works,  ensure  that 

the electricity is turned off;

• 

Mark  the  place  of  mounting  works  with  a  bright  band  in 

order for other persons to keep their distance;

• 

By having regard to the peculiarities of construction, 

please check the suitability of parts supplied together with the 

doors. A safe connection  of  door  structure  with  the  wall  of  the 

building  must  be ensured;

• 

When mounting, dismantling and repairing the doors 

and performing all of drilling/cutting works, please wear protective 

gloves, protective shoes and glasses (some parts may have sharp 

edges);

 

• 

The adding of additional parts or incomplete 

assembly of the doors may impede the performance and safety of 

the doors (it is prohibited to attach other manufacturers parts); 

• 

In these instructions, all of instructions for the assembly 

of parts are depicted from the internal side, unless indicated 

otherwise;

 

• 

Use only work appropriate tools;

• Ensure proper ventilation and desiccation of the building. A proper 

water outfall must be installed in the fl

oor

 because, alternatively, 

there’s a danger of corrosion; 

• 

Prior to starting the plastering, painting and cleaning works, 

please ensure proper protection of the doors, because the 

gypsum, cement, lime, paints and other construction materials 

may damage the surface.

Please follow the mounting sequence indicated in 

6 - 2

2

 pages.

THE TENSIONING OF DOOR SPRINGS

High value torque is affecting the springs, which is why, in 

order to avoid injuries, it is mandatory to ensure their safe tensioning! 

Prior to tensioning the springs, the plane of the doors must be fi xed.

The  CE  sticker  of  the  doors  indicates  approximate 

tensioning  speeds  of  the  springs.  When  the  springs  are  properly 

tensioned,  the  plane  of  the  doors  stops  after  lifting  it  upwards. 

When  performing  the  technical  maintenance,  the  tensioning  of  the 

springs must be checked and, if necessary, they must be additionally 

tensioned.

4. 

OPERATION AND ENVIRONMENTAL CONDITIONS

For the user: 

-  Please  ensure  proper  ventilation  or  desiccation  of  the  building, 

otherwise, danger of corrosion occurs; 

- Prior to starting the plastering or painting works, please ensure the 

proper  protection  of  the  doors,  because  the  cement,  gypsum  and 

other construction materials may damage the surface of the doors; 

- Please protect the doors against aggressive and corrosive materials 

(sprinkled  salt,  acids,  alkalis,  lime,  potassium  saltpeter  stemming 

from  the  bricks),  because  they  aggressively  react  with  the  door 

surface and sealing materials, and create a danger of corrosion;

- The protective fi lm must be peeled off from the doors within 30 days 

from the mounting of them (this instruction is not valid for painted 

doors).

Doors meant to be used in these conditions:

- Maximum outdoor temperature fl uctuation*: from -20 to +50 C°; 

- Relative air moisture: 20 - 90 percent. 

*Large  temperature  fl uctuations  outside  and  inside  may 

cause  the  defects  of  sectional  surface  (bimetal  effect),  especially 

this is valid for dark color segments, which is why, we recommend 

avoiding  them.  The  surface  maintenance  should  be  performed  in 

accordance to this instruction in order to avoid the risk of defects.

- Dangerous / important;

 

- Manual operation;

- Additional instructions.

EN

Residential automation

;

Industrial automation/

Chain drive

.

1

.

1

 

Marking

Summary of Contents for IDO PRO (HL)

Page 1: ...Montavimo eksploatavimo technin s prie i ros ir i montavimo instrukcija Mounting Operation Technical Maintenance and Dismantling Instruction LT EN IDO PRO HL...

Page 2: ...omi elektros darbai Montavimo darb viet pa ym kite ry kia juosta kad kiti asmenys laikyt si saugaus atstumo Atsi velgdami statybos ypatumus patikrinkite kartu tiekiam tvirtinimo detali tinkamum turi b...

Page 3: ...alansavimo sistem tempkite atpalaiduokite spyruokles Atlikite i sami ap i r kaip ir i kart po vart sumontavimo prie juos paleid iant veikimui Kas 6 m nesius arba kaskart po 750 cikl Patikrinkite ar n...

Page 4: ...sons to keep their distance By having regard to the peculiarities of construction please check the suitability of parts supplied together with the doors A safe connection of door structure with the wa...

Page 5: ...en the springs Perform thorough inspection as right after the mounting of the doors but prior to their commissioning Every 6 months or right after 750 cycles Check whether side upper and lower interme...

Page 6: ...01 2 3 4 Angos plotis 125 mm Opening width 125 mm 125 6...

Page 7: ...5 6 7 5 8 7 999 8 8 7...

Page 8: ...012 3 4 4 4 4 4 4 5 3 012 3 4 4 4 66 01 4 4 4 75 4 4 4 8 15 4 4 4 66 9 1 4 4 4 66 012 4 4 4 4 4 4 7 4 4 4 4 4 4 0 8 78 10 A B 4 A B 4 C B 5 3 2 DA A B 8...

Page 9: ...EFG H H H II G J K G J L G J M ENG H H H II OP Q R H OS P Q T H U VW H XXXY Z _ Y a P bc d c OP Q e H bc d c OS P Q T H U VW H OP Q R H OS P Q T H U VW H fg h i i j j k llm 9...

Page 10: ...n o n o p o qqqr s tuvwx r y z 10...

Page 11: ...11...

Page 12: ...12...

Page 13: ...13...

Page 14: ...14 7 5 7 6...

Page 15: ...15 8 8 1...

Page 16: ...16...

Page 17: ...m m m 0 m m 1 m 17...

Page 18: ...2 3 43 2 3 43 5 6 7778 9 8 5 18...

Page 19: ...19...

Page 20: ...DQ 1 H F R R F DH A DQ R B1 L 55 T UV1 WXYZYVU WW _ UY1 1 T YZa Yb1 c W U 1 XZ de 1 V 1 e f b Zg hi1 L 55 EHID 1 J A G j D 1 DQ 1 D BH HI k YZa _ _ 1 c W l 1 XZ de mmmn o pqrst n u v w 9 1 1 J A G EF...

Page 21: ...21...

Page 22: ...22...

Page 23: ......

Page 24: ...UAB IDOMUS V Kr v s pr 129 Kaunas Tel fax 8 37 308 900 info idomus lt www idomus lt...

Reviews: