Heat source

H

e

a

so

u

rc

e

5.4. Rinsing device

At the TERRA SW Complete HGL the rinsing device for the heat source is in the scope of delivery.

Consisting of following parts: 

TRIBLOCK UK 32 DN 25 1IG 3 bar 50 KW

 

brass double nipple 1" 

brass T-fitting

 

ball valve 1" with wing grip 
stair bolt M8 and clamps for wall fastening
ball valve 1" to lock the brine circuit
dirth trap 1" 

The rinsing pump and a for treatment of the brine mixture necessary has to be done on site. 

The heatsource circuit has to be flushed before putting into service, to remove possible fouling.

 

The rinsing device has to be isolated on site with the connection pipes.

In case of servicing or repairing into the heat pump, the ball valve, which is mounted on the outlet flow of the 
machine must be closed and the brine can not flow out.

This procedure avoids dirt in the heat pump. 

The ball valve must be installed in the return flow 

of the heat pump. The ball valve is in the shipment 
of the rinsing device.

The dirth trap must be installed in the flow of the heat pump.

Through close the ball valves, the dirth trap can be easily cleaned.    

Flushing and filling operation

 

The valves at the rinsing device and the expansion tank (fig above) have to be closed before flushing and 
filling operation. The expansion tank is 

not 

connected. To get no dirt in the tank, the expansion tank must be 

connected after the flushing process. 

 

After the filling of the brine circuit the valve of the expansion tank is opened. The pressure in the expansion 
tank before filling is 0,5bar.

 

The remaining brine mixture is filled up, so that the expansion tank is filled. The remaining air is blown off 

through the venting valve on the expansion tank. 

After filling, the pressure must be 1,5bar in the expansion tank.

Inlet flow

Outlet flow

close at flushing and filling

flushing device

ball valve

dirth trap

fig.: flushing device

Summary of Contents for TERRA SW Series

Page 1: ...POWE R FAM I LY w w w i d m e n e r g i e c o m Tepeln erpadla s technologi erstv vody Technick dokumentace N vod k obsluze TERRA SW 6 17 pro za zen solanky a podzemn vody s regulac Navig tor 812280...

Page 2: ...Informationen Mont n n vod Terra SW 2 1 2 3 4 5 6 7 8 9 10 11 12 13 Obsah Obsah 1 V eobecn informace 4 4 4 4 4 4 4 4 4 5 5 5 2 Popis 6 6 6 6 6 7 8 11 3 Mont ze strany topen 12 12 19 4 Mont elekt ina...

Page 3: ...NERGIESYSTEME GMBH Mont n n vod Terra SW 3 1 2 3 4 5 6 7 8 9 1 0 1 1 1 2 1 3 Obsah Obsah 5 Zdroj tepla 27 27 27 27 28 29 29 29 29 30 30 31 31 31 32 33 6 g 34 34 34 34 34 We reserve the right to make t...

Page 4: ...transportovan ho erpadla odstranit teprve tehdy kdy se erpadlo nach z na m st kde m b t zabudov no Sou sti erpadla nesm b t pokl d na ven Tepeln erpadla nesm b t umis ov na do vlhk ch nebo pra n ch m...

Page 5: ...EN DVGW VDI VDE p edpisy m stn ch z sobovac ch podnik Tepeln erpadlo TERRA SW mus b t um st no v m stnosti chr n n p ed mrazem teplota m stnosti se mus pohybovat mezi 5 C a 35 C Aby byly minimalizov n...

Page 6: ...odate n ho vn j ho roz en pro t i sm sn p m topn okruhy Tepeln erpadla TERRA SW 6 17 pracuj s bezpe nostn m chladivem R410A kter p i dn mont i a uveden do provozu cirkuluje v uzav en m okruhu a prakti...

Page 7: ...Rozm ry p poj viz technick data na n sleduj c ch str nk ch na zadn stran tepeln ho erpadla se nach z n lepka s popisem p ipojen TERRA SW 6 17 3 1 2 4 7 6 5 1095 5 199 60 476 203 116 230 116 637 5 760...

Page 8: ...P kon kompresoru N b hov proud kompresor A 13 13 13 13 13 A 13 13 20 13 25 16 32 16 R410A R410A R410A R410A R410A kg 1 30 1 60 1 85 2 12 2 40 lt 0 70 1 20 1 20 1 20 1 90 m 2 95 3 63 4 20 4 82 5 45 db...

Page 9: ...Pa 7 7 9 10 12 Free residual pressure of the charging pump kPa 61 60 55 45 60 For heat pumps with process reversal Cooling output at W B 15 C 7W C kW 5 60 6 90 9 50 12 50 16 40 Cooling output at W B 1...

Page 10: ...1 1 1 1 1 Maximum flow temperature C 62 62 62 62 62 Minimum heating water quantity l h 1 200 1 600 2 050 2 750 3 500 Pressure loss on heating side kPa 7 8 9 10 13 Free residual pressure of the chargin...

Page 11: ...mn vodou Jin m dia p en ej c teplo nejsou p pustn D le nen dovoleno zah v n jin ch kapalin ne je topn voda kvalita topn vody viz str 18 Tepeln erpadla podl haj p irozen hranic m pou it viz skica kter...

Page 12: ...padel na ploch ch nebo podlah ch ur en ch pro lehk stavby U plovouc ch mazanin podlahy by m la b t mazanina a tlumen zvuku krok kolem tepeln ho erpadla vykrojeny viz vyobrazen vedle Platn z kony p edp...

Page 13: ...33 B41 B34 B42 B1 M22 M73 B35 B51 B61 M16 TERRA SW Complete HGL Hygienik HW CW OS RE FS Note This is only a tentative suggestion for installing an IDM heat pump in the heating system This suggestion r...

Page 14: ...hole system T M75 B73 T T T T M TERRA T T B32 B61 B51 B35 B33 B34 B41 B42 B1 M22 M73 M31 M41 M16 T T P T B38 Mont ze strany topen Mont ze strany topen Tepeln erpadlo TERRA SW 6 17 se za zen m Hygienik...

Page 15: ...speicherf hler bei Verwendung des Durchflussz hlers zur W rmemengenerfassung additional Solar board TERRA Complete HGL Buffer Mont ze strany topen Mont ze strany topen V hydraulick m sch matu zobrazen...

Page 16: ...t exchanger for the cooling freezing in winter mode during heating The pipework must also be designed so that there are flows in cool ing mode both the heat exchanger for the cooling and evaporator in...

Page 17: ...l valve is used for the change between heating and cooling circuit The heat pump is operated with process reversal and cools the cooling buffer on desired flow TERRA SW Complete HGL P Hygienik with ST...

Page 18: ...or active coolingwith the heat pump The waste heat can be used e g for hot water preparation or pool heating Furthermore the waste heat can be dissipate into the ground soil Caution The dew point temp...

Page 19: ...draining options at the lowest points To avoid heat loss connection lines should be insu lated using suitable material Oxygen diffusion With plastic pipe underfloor heating or open heating systems whi...

Page 20: ...ired series connected fuse for the primary circuit can be looked up on the circuit diagramm It is essential that a slow blow fuse is used charac teristic C The relevant cable cross section must be det...

Page 21: ...ing unit H8 F6 F1 F2 H4 F8 F4 F5 H7 F10 H6 F3 H5 H1 H3 H2 SD Card Installing the electrics Installing the electrics 4 2 Connection plan for electrical assemblies The central unit on the control is loc...

Page 22: ...run dry When removing the cover hood ensure that the con nection cable between the operating panel and the central unit is only approx 1m long when the oper ating panel is already connected When remov...

Page 23: ...logical us as living beings as well as technical electrical systems They generate undesir able fault currents which can have different effects The effects on biological systems can only be guessed at...

Page 24: ...eparately form mains cables see EMC issue It is recommended to use shielded cable 4 7 2 Sensor equipment The following sensors are included as standard or are already fitted and are necessary in all c...

Page 25: ...rmostat in series 4 11 Composite signal zone valves The composite signal zone valve setting generates a request when one of the zone valves is open The difference to a room thermostat function is that...

Page 26: ...oom units Communication with the Navigator control is effected via a CAN bus connection This allows the Navigator controller to be placed up to 300m away With casca de systems the usage of the externa...

Page 27: ...led due to a reduction in volume when cooling in operation The mixing ratio of the brine medium has to be chosen for 15 C 30 antifreeze ratio If to much antifreeze is mixed the specific heat capac ity...

Page 28: ...560 Connection line mm 32 40 40 40 50 Brine circulating pump 25 6 25 6 25 7 25 7 25 7 Distributor length mm 180 240 300 360 420 Brine mixture lt 105 140 175 210 245 Brine mixture 30 antifreeze proport...

Page 29: ...ght Insert a warning strip approx 0 5 m above the pipes Create a laying plan and take photos The distributor connection can also be made in a shaft outdoors 5 2 Brine depth sensor 5 2 1 Popis With thi...

Page 30: ...Armaflex Brine circuit pump and brine expansion tank must be installed on the inlet side of the heat pump warm side Brine circuit pump and brine circuit expansion ves sel are integrated in the heat pu...

Page 31: ...d safety heat exchanger where appropriate Lay the incoming and outgoing lines to be frost proof sloping towards the reservoir The lines in the building should be insulated against condensation From th...

Page 32: ...via a safety heat exchanger by a brine circuit This means that any damage in the groundwater circuit or in the safety heat exchanger does not result in any additional damage to the heat pump At ground...

Page 33: ...d the brine can not flow out This procedure avoids dirt in the heat pump The ball valve must be installed in the return flow of the heat pump The ball valve is in the shipment of the rinsing device Th...

Page 34: ...changed where necessary The heat pump is fitted with a start up delay If the heat pump is to be drained on the heating side the connection hose on the heat pump return must be disconnected With ground...

Page 35: ...EN 61000 3 2 3 Notified body T V AUSTRIA SERVICE GMBH 0408 Krugerstra e 16 1015 Wien Concerning following products Direct evaporation heat pumps TERRA DE HGL with HGL technology Brine water respective...

Page 36: ...DQUARTERS IN EASTERN TYROL AUSTRIA IDM ENERGIESYSTEME GMBH Seblas 16 18 A 9971 Matrei in Osttirol Austria Telephone 43 0 4875 6172 0 Fax 43 0 4875 6172 85 E mail team idm energie at w w w i d m e n e...

Reviews: