t h e
p o w e r
f a m i l y
(C) IDM ENERGIESYSTEME GMBH
Montážní návod
Terra SW
21
1
2
3
4
5
6
7
8
9
10
11
12
13
1
2
3
4
T 6,3 A
T 6,3 A
T 6,3 A
T 3,15 A
T 1,6 A
T 800 mA
T 160 mA
Display
X1
B
1
19
20
2
X6
X11
X8
X7
X5
F9
K2
X63
X2
X10
F10
X9
X3
K3
K4
X1
X4
K1
B
External expansion
modul/
Cascade user
Internal
expansion module
Control unit
SD
- C
ar
d
LAN
EIB/KNX
St
ep mot
or module
Central processing unit
H8
F6
F1
F2
H4
F8
F4
F5
H7
F10
H6
F3
H5
H1
H3
H2
-
+
SD-Card
Installing the electrics
In
st
a
ll
in
g
t
h
e
e
le
ct
ri
cs
4.2. Connection plan for electrical assemblies
The central unit on the control is located underneath
the cover hood. All connections on the central unit are
plug-in connections.
The operating unit integrated into the cover hood for
the Navigator control is connected to the central unit
via an approx. 1,5 m long patch cable.
Add-on modules such as the expansion module for
two additional heating circuits as well as a GSM mod-
ule can be retrofitted as shown on the plan below.