4.4
Verifying the Installation
After completing the installation the operation must be systematically checked. The installation check
can be divided into three sections:
•
Visual test
•
Basic operational check
•
Detailed operational check
If the basic check of the operational behavior is to be carried out using a (portable) PC a final check
via the intended user control system should also be carried out.