To comply with the Building Regulations, each section must have a tick in one or other of the boxes
CONTROLS
BOILER SERIAL No.
NOTIFICATION No.
BENCHMARK No.
FOR ALL BOILERS CONFIRM THE FOLLOWING
FOR THE CENTRAL HEATING MODE, MEASURE & RECORD
FOR COMBINATION BOILERS ONLY
FOR THE DOMESTIC HOT WATER MODE, MEASURE & RECORD
FOR CONDENSING BOILERS ONLY CONFIRM THE FOLLOWING
FOR ALL INSTALLATIONS CONFIRM THE FOLLOWING
COMMISSIONING ENG’S NAME
GAS BOILER COMMISSIONING CHECKLIST
TIME & TEMPERATURE CONTROL TO HEATING
TIME & TEMPERATURE CONTROL TO HOT WATER
HEATING ZONE VALVES
HOT WATER ZONE VALVES
THERMOSTATIC RADIATOR VALVES
AUTOMATIC BYPASS TO SYSTEM
ROOM T/STAT & PROGRAMMER/TIMER
CYLINDER T/STAT & PROGRAMMER/TIMER
PROGRAMMABLE ROOMSTAT
FITTED
COMBI BOILER
NOT REQUIRED
FITTED
NOT REQUIRED
FITTED
FITTED
NOT REQUIRED
THE SYSTEM HAS BEEN FLUSHED IN ACCORDANCE WITH THE BOILER MANUFACTURER’S INSTRUCTIONS ?
THE SYSTEM CLEANER USED
THE INHIBITOR USED
GAS RATE
BURNER OPERATING PRESSURE (IF APPLICABLE)
CENTRAL HEATING FLOW TEMPERATURE
CENTRAL HEATING RETURN TEMPERATURE
m
3
/hr
ft/hr
N/A
mbar
°C
°C
HAS A WATER SCALE REDUCER BEEN FITTED?
WHAT TYPE OF SCALE REDUCER HAS BEEN FITTED?
YES
NO
GAS RATE
MAXIMUM BURNER OPERATING PRESSURE (IF APPLICABLE)
CENTRAL HEATING FLOW TEMPERATURE
CENTRAL HEATING RETURN TEMPERATURE
m
3
/hr
ft/hr
N/A
mbar
°C
°C
WATER FLOW RATE
lts/min
THE CONDENSATE DRAIN HAS BEEN INSTALLED IN ACCORDANCE WITH
THE MANUFACTURER’S INSTRUCTIONS?
YES
THE HEATING AND HOT WATER SYSTEM COMPLIES
WITH PARTS 4 & 7 OF THE BUILDING REGULATIONS
THE APPLIANCE AND ASSOCIATED EQUIPMENT HAS BEEN INSTALLED AND COMMISSIONED
IN ACCORDANCE WITH THE MANUFACTURER’S INSTRUCTIONS
IF REQUIRED BY THE MANUFACTURER, HAVE YOU RECORDED A CO/CO
2
RATIO READING?
CO/CO
2
RATIO
YES
N/A
THE OPERATION OF THE APPLIANCE AND SYSTEM
CONTROLS HAVE BEEN DEMONSTRATED TO THE CUSTOMER
THE MANUFACTURER’S LITERATURE HAS BEEN LEFT WITH THE CUSTOMER
CORGI ID No.
SIGN
DATE