6
Concord CXi -
Installation
GENERAL
POSITION OF BOILER
Minimum clearances required from walls or
other fixed objects to allow for the free access
of combustion air are shown in Table 4 above.
Any combustible material adjacent to the
boiler and its flue system must be so placed or
shielded as to ensure that its temperature
does not exceed 65
0
C (150
0
F).
Graph 2 - Hydraulic Resistance
Boiler Size
CXi 110
CXi 120
CXi 140
CXi 160
CXi 180
Front clearance
mm (in)
750 (29
1/2
)
Rear clearance
mm (in)
200 (8)
Side clearance
mm (in)
100 (4) - not including clearance for side fitted flow header
Dimension
A
mm (in) 1036 (40
3/4
)
1036 (40
3/4
)
1036 (40
3/4
)
1086 (42
3/4
)
1140 (45)
Dimension
B
mm (in)
175 (7)
175 (7)
175 (7)
197 (7
3/4
)
250 (10)
Dimension
C
mm (in) 1107 (43
3/4
)
1107 (43
3/4
)
1230 (48
1/2
)
1353 (53
1/4
)
1476 (58
1/8
)
Dimension
D
mm (in)
816 (32
1/8
)
816 (32
1/8
)
939 (37)
1062 (42
3/4
)
1185 (46
5/8
)
Dimension
E
mm (in)
553 (21
3/4
)
553 (21
3/4
)
615 (24
1/4
)
676 (26
5/8
)
738 (29)
Dimension
F
mm (in)
220 (8
5/8
)
220 (8
5/8
)
220 (8
5/8
)
220 (8
5/8
)
320 (12
1/2
)
2
CLEARANCES & DIMENSIONS
Table 4
Graph 1 - Heat Load / Water Volume
Summary of Contents for Concord CXi 110
Page 1: ......