20
Concord CX
- Installation
24 TESTING
INST
ALLA
TION
Check there is no spillage of combustion products
from the boiler draught diverter by carrying out a
spillage test, as detailed in BS. 5440:1.
23 SPILLAGE CHECK
INSTALLATION
Check that the main burner responds correctly to manual
on/off operations of any controls fitted in the gas control
circuit. Check, in the following manner, the operation of the
flame failure safety device:
1.
Extinguish the main burner and pilot burner by turning
off the main gas inlet cock. Refer to Frames 20 &21.
2.
Wait for 1
1/2
minutes, during the course of which the
thermocouple-operated solenoid valve in the gas control
(which controls the main and pilot gas flow) will be
heard to close.
3.
Fit the lower casing front panel.
4. Important Commissioning / Operating Instructions:
Do not operate this appliance for long periods or take
any combustion readings with the casing or any part of
the casing removed.
25 ADJUSTMENT OF WATER FLOW
RATE THROUGH THE BOILER
When commissioning the heating/domestic hot water
system the shunt pump must be adjusted to give the
minimum flow rate given in Table 4, when that part of the
system intended to be used for dissipation of residual
heat only is in operation.
26 HANDING OVER
ROUTINE OPERATION
Full instructions covering routine lighting and operation of
the boiler are given on the Lighting and Operation
Instruction Label located on the inside of the casing door.
Draw the attention of the boiler owner or his representative
to the Lighting and Operating Instruction Label on the
inside of the casing door. Give a practical demonstration of
the lighting and shutting down of the boiler.
Describe the function of the boiler and system controls and
show how they are adjusted and used.
Describe the function of the downdraught thermostat if
fitted.
Hand over these and the User’s Instructions to the customer
and request him/her to keep them in a safe place for ready
reference.
IMPORTANT.
Point out to the owner that the boiler must have
regular maintenance and cleaning, at least annually, in order
to ensure reliable and efficient operation. Regular attention
will also prolong the life of the boiler and should preferably be
performed at the end of the heating season.
Recommend that a contract for this work should be made with
the regional gas authority or a Corgi registered heating
installer.
Summary of Contents for Concord CX40
Page 1: ......