Chapter 3
Structured Cable Field Calibration and Testing
3-7
Calibrating the tester for the 110/BIX Block System:
Step 1 and 2
¾
Connect the adapters to the Display Handset (DH) and Remote Handset (RH).
Power both units on.
¾
Connect the RJ45-to-RJ45 patchcord that you plan to use as the RH patchcord to
the adapters of the DH and RH units.
¾
From the DH Ready screen, select Field Calibration. The Calibration screen
appears. Select START to begin the calibration.
¾
Select START again to perform the second calibration process. Each step will
take about 10-20 seconds to complete.
¾
At the completion of this calibration process disconnect the RJ45 patchcord from
the DH unit, leaving the RJ45-to-RJ45 patchcord attached to the RH unit.
Step 3
¾
Insert the second (DH) RJ45 to Block Plug patchcord into the DH unit where the
RJ45 end is connected into the DH unit adapter and the block plug is left open-
ended.
¾
From the DH Field Calibration screen, select START or press AUTOTEST to
begin the third calibration process.
Step 4
¾
From the RH, press AUTOTEST to begin the fourth calibration step.
¾
If calibration is successful, the DH will briefly Display “Calibration Complete” and
the RH will briefly display the PASS light. The handsets and the patchcords are
now ready for testing procedures.
¾
If calibration is unsuccessful, the DH will briefly display either a Warning screen
displaying “No Remote Handset” or a Calibration Failure screen.
Calibrating the tester for the 66 Block System:
Steps 1 and 2
¾
Connect the RJ45 adapters to the Display Handset (DH) and Remote Handset
(RH). Power both units on.
¾
Connect the RJ45-to-RJ45 Patchcord that you plan to use as the RH Patchcord to
the adapters of the DH and RH units.
¾
From the DH Ready screen, select Field Calibration. The Calibration screen
appears. Select START to begin the calibration process on the (RH) Patchcord.
¾
Then select START again to perform the calibration process. This will take about
10-20 seconds to complete.
¾
At the completion of this calibration process disconnect the RJ45 patchcord from
the DH unit leaving the RJ45-to-RJ45 patchcord attached to the RH unit.