36
Viscount GTS -
Installation & Servicing
INSTALLATION
• Fit the four “Rapid nuts” on the front of the cable
channels (1).
• Fit the Rapid nuts in the slot (2):
- 4 Rapid nuts for 7-17 sections,
- 8 Rapid nuts for 18-25 sections.
• Fix
the control panel
bracket (package
IG84 or IG85
)
underneath the two cable channels by means of two M8 x 16
screws and two serrated washers.
• Place the front crosspiece underneath the control panel
bracket and fasten from below with M8 x 30 screws and
serrated washers.
2
2
1
VIS9147
• Fix to the side panels with two Ø 3.94 x 12.7 tapping screws
and serrated washers
VIS5117
55 ASSEMBLING THE CONTROL PANEL BRACKET
56 INSTALLING THE CONTROL PANEL
INST
ALLA
TION