16
Standard Height Frame & Header Kits
7.2.5 INSTALLATION DRAWING WITH 4 – 30-100 BOILERS (SIDE BY SIDE) LOW LOSS
HEADERS OR PLATE HEAT EXCHANGERS
300
650
2" BSP Female
ALL DIMENSIONS ARE IN mm
Gas Connection
SYSTEM RETURN
DN100 FLANGE CONN
SYSTEM FLOW
DN100 FLANGE CONN
BETWEEN
BOILERS
BETWEEN
BOILERS
BETWEEN
BOILERS
Note 1: Mixing header and gas connections can be
located either on the LHS or RHS of the assembly to
suit needs of each particular system.
Note 2: Optional frame (UIN206970) one req'd per boiler
Concentric Flue Connector
100kW = 100/150
30-80kW = 80/125
500
500
143
500
130 (30-80k
W
)
226 (100k
W
)
500
50
50
50
550 CRS
550 CRS 550 CRS
520 (100k
W
)
360 (30-80k
W
)
25
2200
25
2580
530
850
200
380
574 - 100kW
414 - 30 to 80kW
560
456
212
1950 (to top of Frame)
1918 (to top boiler)
Note 3: Optional low loss header (UIN219553) one req’d per cascade
300
650
530
850
574 -120kW
560
456
664 - 150kW
212
200
380
1650
25
25
2030
2" BSP Female
BOILERS
BETWEEN
SYSTEM FLOW
BOILERS
BETWEEN
100/150 Concentric Flue Connector
DN100 FLANGE CONN
ALL DIMENSIONS ARE IN mm
Gas Connection
DN100 FLANGE CONN
SYSTEM RETURN
Note 1: Mixing header and gas connections can be
located either on the LHS or RHS of the assembly to
suit needs of each particular system.
Note 2: Optional frame (UIN206970) one req'd per boiler
500
500
226 (120k
W
)
500
233 (150k
W
)
50
50
143
550 CRS
550 CRS
610 (150k
W
)
520 (120k
W
)
1950 (to top of Frame)
1918 (to top boiler)
Note 3: Optional low loss header (UIN219553) one req’d per cascade
7.2.4 INSTALLATION DRAWING WITH 3 – 120/150 BOILERS (SIDE BY SIDE) LOW LOSS
HEADERS OR PLATE HEAT EXCHANGERS
Summary of Contents for Evomax 100
Page 26: ...26 Frame Header Kits NOTES ...
Page 27: ...27 Frame Header Kits NOTES ...