Weather Compensation Kit - 

Installation

CH OPERATION

The On and Off time control of central heating should be 

controlled by a separate timer.
During programmed On times the Central Heating Radiator 

Flow Temperature is controlled by the boiler relative to the 

Outside Temperature as shown in the diagram.
The Room temperature can be adjusted using the Central 

Heating Temperature Control Knob on the boiler as follows.  

Essentially rotating the knob clockwise increases the room 

temperature and rotating the knob anti-clockwise decreases the 

room temperature.
The Room Temperature Setpoint in the associated graph is 

not directly related to the Actual Room Temperature but is the 

Nominal Room Temperature during a programmed CH period.
This can be adjusted between 5 and 30 degrees by the 

CH Potentiometer Knob on the Boiler when the Outside 

Temperature Sensor is connected. The graph only shows 

temperatures between 12 and 30 degrees for clarity.

Examples:
1.  If the CH Potentiometer Knob is set to display 22ºC on the 

Boiler Display the Room Temperature Setpoint will be 22ºC 

and the curve 22 will be followed, indicated by 11th curve 

in from the left hand side. So as the outside temperature 

varies the Flow Setpoint to the CH circuit will increase and 

decrease proportionally.

2.  If the CH Potentiometer Knob is rotated fully clockwise, the 

Boiler Display will read 30ºC and the Room Temperature 

Setpoint will be 30ºC hence the curve 30 will be followed.

3.  If the CH Potentiometer Knob is rotated fully anticlockwise, 

the Boiler Display will read 5ºC and the Room Temperature 

Setpoint will be 5ºC. This is an unrealistic Room 

Temperature Setpoint for a CH period during an ON time, 

but it is calculated internally for managing Frost Protection 

for the system based upon Outside Temperature.

DHW OPERATION 

When the system is in a timed on period for DHW and the tank 

stat is not satisfied, OV will be generated on the switched live 

input SL2 of the boiler.
This will ensure that Weather Compensation adjustment is 

ignored at this time. The set point will be fixed at 80 degrees.
The demand is indicated on the display by ‘ON’ and the burner 

on symbol as appropriate.

7  WEATHER COMPENSATION KIT OPERATION

FL

O

W

 SE

TP

O

IN

T

OUTSIDE TEMPERATURE

ROOM TEMPERATURE SETPOINT

Summary of Contents for Logic Combi C

Page 1: ... we require Do not use reconditioned or copy parts that have not been clearly authorised by Ideal Boilers For the very latest copy of literature for specification and maintenance practices visit our website www idealboilers com where you can download the relevant information in PDF format September 2018 UIN 216120 A09 WEATHER COMPENSATION KIT ...

Page 2: ...ather compensation temperature sensor which is compatible with the boiler and provides weather compensation control that has been permanently enabled The boiler has been commissioned in accordance with manufacturer instructions which have been supplied to the householder The central heating temperature control knob should normally be set in the mid position Terminal block 2 way wire connection Cab...

Page 3: ...s connection is protected extra low voltage It is not necessary for the person carrying out the wiring to be approved to Part P of the Building Regulations Avoid running this cable alongside mains voltage cables WIRING THE WEATHER COMPENSATION KIT TO THE BOILER 1 Isolate the electricity supply to the boiler 2 Remove the boiler front panel refer to boiler installation instructions 3 Hinge down the ...

Page 4: ...Z E t K KE t KE Z z W E s s d D Z Ž Ő ǁ Ő LJ ď N L BLR ON C S ON HW OFF HW ON R S ON CH ON E L FUSED SPUR SYSTEM BOILER WITH S PLAN OUTSIDE SENSOR L N HW OFF CH ON HW ON R S C S S PLAN VALVE HW TIMER S PLAN VALVE CH g y b br o br o N E L IN L IN L N E sL2 sL1 MAINS IN BOILER g y b g g SYSTEM BOILER WITH S PLAN SYSTEM OUTSIDE SENSOR KIT SYSTEM BOILER WITH Y PLAN SYSTEM OUTSIDE SENSOR KIT ...

Page 5: ...E E h WhZ d K Z t d z W E Θ Khd E KZ E t K KE t KE Z z W E s s d D Z WhDW ď Ž Ő ǁ Ő LJ Ž Ő LJ KE t K t KE Z KE KE E Z KE h WhZ d K Z t d W E Θ Khd E KZ E t K KE t KE Z W E s s t d D Z E E E Ɛ Ϯ Ɛ ϭ D E E K Z W E s s WhDW Ő ď ďƌ Ž ďƌ E Ő LJ ď Ő HEAT BOILER WITH S PLAN SYSTEM OUTSIDE SENSOR KIT HEAT BOILER WITH Y PLAN SYSTEM OUTSIDE SENSOR KIT ...

Page 6: ...LY N L BLR HW C S ON HW OFF HW ON R S ON CH ON E L FUSED SPUR SYSTEM BOILER WITH S PLAN OUTSIDE SENSOR L N HW OFF CH ON HW ON R S C S S PLAN VALVE HW TIMER S PLAN VALVE CH g y b br o br o N E L IN L IN L N E sL2 sL1 MAINS IN BOILER g y b g g BLR CH SYSTEM BOILER WITH S PLAN SYSTEM OUTSIDE SENSOR KIT ...

Page 7: ...splay the Room Temperature Setpoint will be 22ºC and the curve 22 will be followed indicated by 11th curve in from the left hand side So as the outside temperature varies the Flow Setpoint to the CH circuit will increase and decrease proportionally 2 If the CH Potentiometer Knob is rotated fully clockwise the Boiler Display will read 30ºC and the Room Temperature Setpoint will be 30ºC hence the cu...

Page 8: ...l Training The Ideal Technical Training Centre offers a series of first class training courses for domestic commercial and industrial heating installers engineers and system specifiers For details of courses please ring 01482 498432 Ideal Boilers Ltd PO Box 103 National Avenue Kingston Upon Hull HU5 4JN Tel 01482 492251 Fax 01482 448858 Registration No London 322 137 Ideal Technical Helpline 01482...