background image

Classic 

 FF

 - 

Installation & Servicing

15

INSTALLATION

REAR FLUE OUTLET

14 CUTTING THE FLUE  - wall thicknesses of 114 to 600mm

Note. 

If the stand-off brackets are used it is essential that

30mm is added to the measured wall thickness when
marking the flue (to allow for the thickness of the brackets).

1. Measure and note the wall thickness X.

2. Mark the wall thickness onto the flue.

3. To ensure the tube is cut square, mark the flue all the

way round.

4. Cut to length X, using the cardboard ring for support.

5. Remove cardboard ring and remove any burrs.

15 FITTING THE BOILER SEALING RING TO THE FLUE

2. Drill 3 holes 3.2mm (

1/8

") dia. through the outer flue duct

and boiler sealing ring. 

Do NOT drill the inner flue

duct

.

3. Insert the self-tapping screws, provided, in order to fix the

boiler sealing ring in position.

1. Fit the boiler sealing ring inside the outer flue duct. Ensure

the boiler sealing ring is fully engaged.

Ensure the notch aligns with  the groove on the outer flue
duct. This ensures correct alignment of the flue terminal.

4. Stick the self-adhesive

foam strip, provided in the
hardware pack, onto the
flue immediately behind
the boiler sealing ring.

17 WALL MOUNTING PLATE

1. Fix the mounting plate to the wall with the No.14 x 50mm wood

screws.

2. If downward routing of pipes is required then the downward

routing pipe brackets and M8 spacer (supplied in the
Downward Piping Kit) should be fitted to the wall mounting
plate now.

3. Fit the bottom 2 screws to secure the bracket(s) to the wall,

through the wall mounting plate.

4. Check with a spirit level that the plate is vertical.

16 FITTING THE FLUE ASSEMBLY

1. Insert the flue extension tube into the flue assembly.

2. Insert the flue assembly through the hole far enough to

allow the rubber seal to unfold completely and form an
adequate seal on the outside wall.

3. Ensure the notch is at the top. This will aid the location of

the studs into the boiler back panel.

Summary of Contents for FF 330

Page 1: ...EERED FOR PEACE OF MIND When replacing any part on this appliance use only spare parts that you can be assured conform to the safety and performance specification that we require Do not use reconditio...

Page 2: ...m 28mm copper copper FEMALE Maximum static water head m ft 30 5 100 Minimum static water head m ft 0 45 1 5 Electrical supply 230 V 50 Hz Boiler power consumption 100W Fuse rating External 3A Internal...

Page 3: ...07 Destination Countries GB IE Models G C Appliance No Classic FF 330 41 391 54 Classic FF 340 41 391 95 Classic FF 350 41 391 96 Classic FF 360 41 391 97 Classic FF 370 41 391 98 Classic FF 380 41 39...

Page 4: ...eal Limited could invalidate the BSI Certification and the normal appliance warranty It could also infringe the Gas Safety Regulations and the above regulations SAFE HANDLING OF SUBSTANCES Care should...

Page 5: ...ns packed with the unit for the necessary clearances Pelmet restrictions If the ability to fit or remove the casing during installation and subsequent servicing is impaired by pelmets etc this operati...

Page 6: ...ngs are specified in Table 3 4 Where the lowest part of the terminal is fitted less than 2m 6 6 above a balcony above ground or above a flat roof to which people have access then the terminal MUST be...

Page 7: ...al Limited INVALID Caradon Ideal Limited recommend Water Treatment in accordance with the Benchmark Guidance Notes on Water Treatment in Central Heating Systems Caradon Ideal Limited recommend the use...

Page 8: ...Limited Note A cold water feed must be available back to the boiler when all automatic valves are in the closed position refer to BS 6798 and when close coupled the feed must not be in a vertical leg...

Page 9: ...overing at least the range 0 4 bar 0 60 lb in2 must be fitted to the system The gauge should be easily seen from the filling point and should preferably be connected at the same point as the expansion...

Page 10: ...n automatic air vent connected between them the stop valve being located between the system and the automatic air vent The stop valve may remain open during normal operation of the system if automatic...

Page 11: ...shown LEGEND 1A Heat exchanger 2 Flue baffles 3 Tie rods 4A Pumped flow pipe 5A Pumped return pipe 6 Collector hood assembly 7 Combustion chamber 12 Main burner 19 Control box 24 Pressure switch 30 F...

Page 12: ...1 off No 8 x 8 lg Pozi pan hd screws 3 off 8 UNPACKING Pack A Contents The complete boiler Installation Servicing Instructions User s Instructions Hardware Pack listed below Wall mounting template Wal...

Page 13: ...d Pack D optional extension kit for side flue or rear flue outlet Refer to Frame 33 1 A maximum of 2 extension ducts plus the standard flue duct may be used together 2 Flue extensions of greater than...

Page 14: ...n 3 Ensure squareness by hanging a plumb line as shown 4 Mark onto the wall if required the following a The wall mounting plate screw positions choose one from each group Note Mark the centre of the f...

Page 15: ...uct Ensure the boiler sealing ring is fully engaged Ensure the notch aligns with the groove on the outer flue duct This ensures correct alignment of the flue terminal 4 Stick the self adhesive foam st...

Page 16: ...boiler 1 Lift the boiler onto the wall mounting plate hooks as shown Do not use the burner controls for lifting 2 Fit the M8 screw washer and rectangular plate to retain the boiler Note Before fully t...

Page 17: ...hole has been accurately cut with a drill then making good the wall faces is not essential as seals are provided at both ends of the flue However both wall faces immediately around the cut hole should...

Page 18: ...s cut square mark the flue all the way round 4 Insert the cardboard duct ring for support and cut to length 5 Remove cardboard duct ring and remove any burrs 26 FITTING BOILER SEALING RING TO THE FLUE...

Page 19: ...s is required then the downward routing pipe brackets and M8 spacer supplied in the Downward Piping Kit should be fitted to the wall mounting plate now 3 Fit the bottom 2 screws to secure the bracket...

Page 20: ...to the fan 5 Pull the flue extension tube and engage onto the fan elbow and secure with the screw attached to the elbow Note The sealing ring studs will locate in the back panel one way only This will...

Page 21: ...for FF 3 100 model 35 FITTING THE KIT 1 Remove the cardboard support aid from the flue and place safely to one side 2 Fit the inner flue extension duct onto the inner flue duct 3 Fit the outer flue ex...

Page 22: ...to Frame 43 3 If a proprietary system is used follow the instructions supplied by the manufacturer 4 System designs featuring controls or wiring arrangements which allow the boiler to fire when there...

Page 23: ...led system set the boiler thermostat to maximum 4 Switchmaster Midi is similar in operation but the wiring differs slightly see the manufacturer s literature 40 PICTORIAL WIRING 41 MID POSITION VALVE...

Page 24: ...e left off for more than a day or so then a frost thermostat should be wired into the system This is usually done at the programmer in which case the programme selector switches are set to OFF and all...

Page 25: ...servicing position See diagram B 4 Slacken the screw in the burner pressure test point F and connect a gas pressure gauge via a flexible tube 5 Swing the control box back into its working position 6 P...

Page 26: ...002 10 Stress the importance of regular servicing by a CORGI registered installer and that a comprehensive service should be carried out AT LEAST ONCE A YEAR In IE servicing work must be carried out b...

Page 27: ...e LH bottom rear of the burner and pull the burner downwards to disengage the retention tab Remove the burner to a safe place for inspection and cleaning 2 Remove the control box fixing screw Pull the...

Page 28: ...o the fan Disconnect the connector from the fan and slide into the flue 3b Side or top flue Slacken off two M4 screws securing the flue elbow and flue connector Disconnect the flue connector from the...

Page 29: ...hermostat and reassemble in reverse order 6 Check the operation of the boiler 55 GAS PRESSURE ADJUSTMENT PILOT The pilot is factory set to maximum and no further adjustment is possible If after removi...

Page 30: ...sensor lead connector off the printed circuit board and cut the cable strap securing the thermistor harness to the bottom panel of the control box if fitted and remove the strap 6 Remove the sensor f...

Page 31: ...her is replaced when refitting the pilot injector 6 Replace the electrode and pilot shield retaining both with the electrode nut Check the spark gap 7 Reassemble in reverse order 8 Check the operation...

Page 32: ...f the procedure detailed below 1 Refer to Frame 56 2 Remove the burner and air box assembly Refer to Frame 51 3 Remove the electrode retaining nut 4 Remove the pilot shield 5 Remove the ignition elect...

Page 33: ...ts and withdraw from the control box 6 Fit the new PCB and reassemble in reverse order 7 Check the operation of the boiler Fuse To change the fuse prise it out of the holder and disengage the fuse Ref...

Page 34: ...with water pipes and hang it on the key hole slots and screws Retighten the screws 12 Replace the 2 rubber sealing grommets 13 Reassemble in reverse order 14 Remake all water connections ensuring that...

Page 35: ...ked YES Replace gas valve NO Is there a supply on terminals of main gas valve YES NO YES NO NO Is there a supply on the fan connector at PCB Molex marked FAN YES YES NO NO Check the polarity of the ma...

Page 36: ...929 30 Fan assembly E83 665 FF 330 380 1 171 461 E87 032 FF 3100 1 171 462 35 Boiler casing assembly complete with sightglass assy insulation and M5 x 16 dogpoint pozi pan hd FF 330 380 1 171 471 FF...

Page 37: ...Classic FF Installation Servicing 37 LIST OF PARTS cla 6113 45 59 23 12 18 19 30 24 39 9 17 26 15 14 13 13 A 72 SHORT PARTS LIST 73 BOILER CASING ASSEMBLY...

Page 38: ...pilot assembly 12 Main burner 13 Main burner injector 16 Pilot shield 17 Gas control valve 42 Gas service cock 75 BURNER ASSEMBLY Exploded View LEGEND 19 Control box 21 Thermostat potentiometer 23 Pr...

Page 39: ...Classic FF Installation Servicing 39 NOTES...

Page 40: ...cation without notice The Ideal Boilers Technical Training Centre offers a series of first class training courses for domestic commercial and industrial heating installers engineers and system specifi...

Reviews: