Classic
LXFF, FF
-
Installation
19
INSTALLATION
SIDE FLUE OUTLET
31 FLUE EXTENSION DUCTS -
For flue lengths greater than 600mm (Not for FF 2 100 model)
30 TERMINAL WALL PLATE
29 CONNECTING THE FLUE TO THE BOILER
1.
Pull the flue through the side outlet plate and locate
the 3 studs in the hole in the side of the boiler.
2.
Secure the flue to the boiler using the three M5 nuts
provided.
3.
Insert the flue extension tube into the flue.
4.
Fit the 90° flue elbow, supplied with the boiler, onto
the fan in the direction required, after first removing
the underside screw, which is not required. Secure in
position with the screw attached to the fan.
5.
Pull the flue extension tube and engage onto the fan
elbow and secure with the screw attached to the
elbow.
Note.
The sealing ring studs will locate in the back
panel one way only. This will ensure that the terminal
grille is correctly aligned.
This plate allows neat concealment and full
compression of the rubber seal. Its use is not essential
if the flue hole and flue ducts have been accurately cut
and the outside wall face is flat.
1.
Position the terminal wall plate over the terminal.
2.
Drill 4 fixing holes with a 7mm (
9/32
") masonry drill.
3.
Insert the 4 plastic plugs provided.
4.
Secure the plate with 4 of the No.10 x 2" screws
provided.
Note.
If the terminal is less than 2m (6' 6") above
ground level, an approved terminal guard should be
fitted. Refer to the contents list on Page 4.
PACK D
Flue extension duct kit contents.
Summary of Contents for Classic FF230
Page 1: ......