background image

6

 British Gas RD1

 

Installation & Servicing

GENERAL

This appliance is NOT suitable for use in a direct hot water system.

1. If the boiler is to be used for gravity domestic hot water supply then cut off the spun

ends of the gravity flow and return pipes and fit the 22 mm to 28 mm copper
compression fittings (provided in the Hardware Pack) at the boiler gravity flow and
return connections, in order to run the gravity circuits in 28 mm pipe. Note. 

The 3100

is not suitable for gravity circulation.

2. 370 to 3100 ONLY

must be fitted with the 22mm x 28mm copper compression fittings, provided in the
Hardware Pack and the pumped flow and return pipes run in 28mm pipe.

3. The boiler is suitable for use on a sealed system. An overheat thermostat is fitted as

standard.

1

BOILER WATER CONNECTIONS

The following minimum clearances
must be maintained for servicing.
Additional space will be required for
installation, depending upon site
conditions.
Side and Rear Flue
a. 
Provided that the flue hole is cut

accurately, e.g.  with a core drill,
the flue can be installed from
inside the building.
Installation from inside ONLY

b. If a core boring tool is to be used

inside the building; the space in
which the boiler is to be installed
must be at least wide enough to
accommodate the tool.

c. If using the Complete Sealed

System Unit then refer to the
instructions packed with the unit
for the necessary clearances.

Pelmet restrictions.

If the ability to fit or remove the
casing during installation and
subsequent servicing is impaired
by pelmets etc. this operation can
be made easier by first removing
the controls support casing in line
with the following instructions:

a. Release the controls pod

casing fixing screws (a) 3 full
turns only. Remove the
support by pulling it forward to
disengage from the keyhole
slots.

b. Undo the 2 screws (b)

retaining casing to the back
panel.

c. The casing can now be

removed in the direction of the
arrow, first lifting the casing
slightly to disengage the
casing top return from the
back panel. (For this purpose
a minimum clearance of
12mm is required between the
top of the boiler and pelmet or
other similar obstruction.

Front clearance: 533mm (21") from
the front of the boiler casing.

Minimum front clearance when built
in to cupboard is 75 mm (3").

380 (15")

300 (12")

Pumped
return
pipe

Pumped flow pipe

12 (1/2")

100

(4")

44

(1 3/4")

Flue
terminal

300 (12")

Jacking 
screw

Gas
connection

700
(27 1/2")

141
(5 9/16")

Clas 1786

Front View

Side View

133 (5 1/4")

44 (1 3/4")

20 (3/4")

Gas
connection

190 (7 

1/2

")

Flow

Gravity

Return

flue

2 BOILER CLEARANCES

Summary of Contents for British Gas 330 RD1

Page 1: ...INSTALLATION M A N U A L British Scottish Gas RD1 the wall hung boiler Wall hung gas fired fanned flue boiler Installers guide to central heating boilers SERVICING 330 3100 RD1...

Page 2: ...Complete range There are 7 models in the range All models include a Downward Routing Pipe Kit and an overheat thermostat Full system suitability Most models are suitable for connection to pumped open...

Page 3: ...45 1 5 Electrical supply 230 V 50 Hz Boiler power consumption 150W Fuse rating External 3A Internal F2A to BS 4265 Water content litre gal 2 7 0 6 3 65 0 8 4 65 1 0 4 65 1 0 Dry Weight kg lb 40 9 90...

Page 4: ...this case are concentric The fan is down stream of the combustion chamber I2H An appliance designed for use on 2nd Family gas Group H only B G Certified P I No 87 BL 27 Destination Countries GB Natura...

Page 5: ...t water boilers of rated input not exceeding 60 kW BS 5449 Forced circulation hot water systems BS 5546 Installation of gas hot water supplies for domestic purposes 2nd Family Gases BS 7593 Treatment...

Page 6: ...the space in which the boiler is to be installed must be at least wide enough to accommodate the tool c If using the Complete Sealed System Unit then refer to the instructions packed with the unit fo...

Page 7: ...g Installation pipes MUST be fitted in accordance with BS 6891 Pipework from the meter to the boiler MUST be of an adequate size 3100 models should be piped in 22mm minimum The final 1 metre may be ru...

Page 8: ...sing mains electricity should be so situated that it cannot be touched by a person using the bath or shower See Frame 31 for details the cupboard compartment at both high and low levels The air vents...

Page 9: ...a domestic circulator capable of providing an 11 C 20 F temperature differential e g Grundfos UPS 15 50 or equivalent The vertical distance between the pump and feed expansion cistern MUST comply with...

Page 10: ...st be connected at a point close to the inlet side of the pump the connecting pipe being not less than 15mm 1 2 nominal size and not incorporating valves of any sort b The vessel capacity must be adeq...

Page 11: ...valve and a stop valve with an automatic air vent connected between them the stop valve being located between the system and the automatic air vent The stop valve may remain open during normal operati...

Page 12: ...ravity horizontal pipes should be ABOVE ceiling level and as SHORT as possible A MINIMUM inclination of 25mm per 3m run 1 per 10 is required to avoid air locks If these conditions cannot be met pumped...

Page 13: ...ted below Wall mounting template Wall mounting plate Side outlet terminal mounting plate Flue extension tube Boiler sealing ring Flue elbow Downward routing pipe kit Boiler Hardware Pack Contents 50mm...

Page 14: ...applicable the extension flue box es 10 PACKAGING AND CASING REMOVAL 11 DOWNWARD ROUTING PIPE KIT Product Qty Downward pipe routing bracket 2 off M8 Spacing pillar 1 off M5 Spacing pillar 1 off Panel...

Page 15: ...t with the support bracket It is MOST IMPORTANT that the boiler is installed in a vertical position Flue length mm Accessories Product No Up to 600 B Pack 1 off 150 308 600 to 1550 B Pack 1 off D Pack...

Page 16: ...d in a separate kit must be used These brackets are secured to the wall mounting plate and it is essential to use only those holes as shown on the wall mounting template 1 An optional flue duct extens...

Page 17: ...Flue extension ducts 1 Cut the flue hole preferably with a 125mm 5 core boring tool ensuring that the hole is square to the wall If the hole has been accurately cut with a drill then making good the...

Page 18: ...e outer flue duct This ensures correct alignment of the flue terminal 4 Stick the self adhesive foam strip provided in the hardware pack onto the flue immediately behind the boiler sealing ring 21 FIT...

Page 19: ...blanking plate from the direction required and use this to blank off the rear outlet Side and rear flue 2 Lift the boiler onto the wall mounting plate hooks as shown Do not use the burner controls fo...

Page 20: ...50 B Pack 1 off D Pack 1 off see Frame 12 1550 to 2500 B Pack 1 off D Pack 2 off see Frame 12 2500 to 3000 B Pack 1 off D Pack 3 off see Frame 12 Note Side flue shown 26 FLUE EXTENSION DUCTS For flue...

Page 21: ...Hz is required All external controls and wiring must be suitable for mains voltage Wiring should be in 3 core PVC insulated sheathed cable not less than 0 75mm2 24 x 0 2mm to BS 6500 Table 16 Wiring R...

Page 22: ...e wired in parallel with the control s to be overridden Refer to Frame 38 4 If a proprietary system is used follow the instructions supplied by the manufacturer Advice on required modifications to the...

Page 23: ...w or or r b b r r w w b br y y y g y g y g pky w pk y r r r w y g 34 PICTORIAL WIRING IMPORTANT No system controls to be wired in this mains supply Notes 1 Some earth wires are omitted for clarity En...

Page 24: ...terminals on thermostats see the manufacturer s literature 3 This is a fully controlled system set the boiler thermostat to maximum 4 Switchmaster Smiths valves are similar but note that the GREY wire...

Page 25: ...should suffice for all systems which do not use the OFF terminals of the programmer Diagram B shows a change over frost stat which will cover most systems which do use CH OFF If however on such a sys...

Page 26: ...wing the control box back into its working position 6 Switch the electricity supply ON and check that all external controls are calling for heat 7 Press the boiler reset switch H and the overheat ther...

Page 27: ...service contract yourself or alternatively offer to the customer the benefits of the British Gas Services details of which are outlined in the household pack supplied with this boiler After completin...

Page 28: ...the burner downwards to disengage the retention tab Remove the burner to a safe place for inspection and cleaning 2 Remove the fixing screws and swing the control box down into the servicing position...

Page 29: ...lue elbow and flue connector Disconnect the flue connector from the elbow and slide into the flue Remove the flue elbow 5 Disconnect the silicon rubber tube from the rear of the collector hood 6 Slack...

Page 30: ...etailed in Frame 48 and ensuring that there is an inlet pressure of 20 mbar available the pilot does not light then contact British Gas Services Relight in accordance with Initial Lighting Frame 40 52...

Page 31: ...of the switch 12 Press in the 2 side retaining clips and remove the switch 13 Replace and reassemble in reverse order 14 Check the operation of the boiler 54 CONTROL POTENTIOMETER THERMISTOR SENSOR LE...

Page 32: ...he burner 4 At this stage the main burner injector can be removed checked cleaned or replaced as required Ensure that an approved jointing compound is used sparingly 5 Fit the new burner ensuring that...

Page 33: ...hdraw from the control box 6 Fit the new PCB and reassemble in reverse order 7 Check the operation of the boiler Fuse To change the fuse prise the top off the holder and disengage the fuse Refer to Fr...

Page 34: ...6 3 Drain the system 4 Disconnect the water connections If compression fittings are used then cut the pipes both above and below the fittings in order to allow the heat exchanger assembly to be remove...

Page 35: ...S NO Change pressure switch Is fault corrected Is the boiler casing correctly fitted Does the main burner light NO YES YES Does the hot surface igniter turn off NO Is there a gas supply to the boiler...

Page 36: ...71 441 18 308 317 Detection electrode complete with lead and backnut 410 mm lg 1 171 442 18 1 Hot surface igniter 330 340 1 171 973 18 2 Hot surface igniter 350 380 3100 1 171 490 19 E58 681 Control b...

Page 37: ...ARTS LEGEND Numbers up to 51 relate to the B G spares list 10 Burner manifold 11 Air box and pilot assembly 12 Main burner 13 Main burner injector 67 BURNER ASSEMBLY Exploded View 16 Pilot shield 17 G...

Page 38: ...LIST OF PARTS LED 1 LED 2 LED 3 LED 4 23A Fuse 21A Cla 2710 58A 26 LEGEND 19 Control box 21A Thermostat potentiometer 26 Thermostat knob 23A Printed circuit board 58A Lockout reset switch 68 CONTROL B...

Page 39: ...British Gas RD1 Installation Servicing 39 NOTES...

Page 40: ...British Gas by Ideal Boilers British Gas Services Limited Registered in England No 3141243 Registered Office Millstream Maidenhead Road Windsor Berkshire SL4 5GD British Gas Services Ltd has made eve...

Reviews: