British Gas RD1
-
Installation & Servicing
13
INSTALLATION
Complete boiler
Top of cabinet
Wall mounting template
Side of cabinet
Side of cabinet
B
A
Cla 1788
Wall mounting plate
Wall mounting template
The boiler is supplied fully assembled in Pack A, together with
a standard flue assembly for lengths up to 600mm (23
1/2
"),
rear or side flue outlet, in Pack B.
Unpack and check the contents.
Flue Pack B Contents
!
Duct cutting support, 2 off
(cardboard )
!
Terminal wall plate, 1 off.
!
Terminal grille assy., 1 off.
!
Polyurethane foam seal 400 lg., 1 off.
!
No. 8 x 8 lg. Pozi pan hd. screws, 3 off.
9
UNPACKING
Pack A Contents
!
The complete boiler.
!
Installation & Servicing Instructions.
!
User's Instructions.
!
Hardware Pack (listed below).
!
Wall mounting template.
!
Wall mounting plate.
!
Side outlet terminal mounting plate.
!
Flue extension tube.
!
Boiler sealing ring.
!
Flue elbow.
!
Downward routing pipe kit.
Boiler Hardware Pack Contents
!
50mm x No. 14 wood screw, 4 off.
!
50mm x No. 10 wood screw, 8 off.
!
Wall plug , 12 off.
!
M8 washer, 1 off.
!
Sealing plate, 1 off
!
M5 wing nut, 3 off
!
M8 x 12 Hx. Hd. screw, 1 off.
!
British Gas Logo, 1 off.
!
Scottish Gas Logo, 1 off.
!
Bar clamp, 1 off.
!
M3 x 16 screw, 2 off.
!
330-360 RD1 only
22mm straight coupler
compression fittings -2 off. For
connection to the boiler
PUMPED flow and return pipes
28mm x 22mm reducing
coupler compression fittings -
2 off. For connection to the
boiler GRAVITY flow and
return pipes.
!
370-3100 RD1 only
28mm x 22mm reducing coupler
compression fittings -4 off. For
connection to the boiler PUMPED
AND GRAVITY flow and return pipes.
Note.
The 3100 RD1 is not suitable for
gravity systems.
INST
ALLA
TION