TITAN ELITE CEILING & WALL MOUNT INsTALL
TITAN ELITE INSTALLATION - 09/01/16 pjm
bearing
Ceiling
pipe
End cap
End cover
End cover
Top cover
End cap
Page 4 of 4
Cord Management - Ceiling Mount
ADJUsT ARM REsIsTANCE
Extend the arm
straight out as shown
before adjusting the arm’s
resistance. Be sure all equipment
is mounted on the arm before
adjusting. Use the T-handle provided
to adjust the arm’s resistance.
Do not USe Power tooLS to ADJUSt.
MANAGE CABLEs THROUGH ARM - CEILING MOUNT
REATTACH ARM COVERs
TOP COVERs:
Reattach the long arm covers by replacing the two
1/4” long 6-32 flathead screws in the center of the
cover using a Phillips head screwdriver.
CENTER COVER:
Reattach the center cover by replacing the four 3/4”
long 10-24 flathead screws using a Phillips head
screwdriver.
END COVERs:
Reattach the end covers by replacing the two 3/4”
long 10-24 flathead screws using a Phillips head
screwdriver.
Torque Chart- In/lbs
2/23/2016
Minimum torque values
Monitor Mount
Arm
Base
Mount Arm Joint Paralink EV710
Ultra
0
2
1
-
0
2
1
-
0
2
1
e
ti
l
E
0
2
1
-
0
2
1
0
2
1
0
2
1
e
ti
l
E
2
T
Titan (T2)
120
120
120
-
120
0
2
1
5
8
0
2
1
0
2
1
0
2
1
a
rt
l
U
UL180 / UL182
120
120
-
85
-
MD Arm
140
-
120
-
120
Feed monitor and other cords and any other cords down
through the ceiling extension pipe. Slip all cords through
Titan arm, out through end cap and into the back of the
Elite arm. When running cords through arm, keep them
all to one side of bolts at Titan arm joints. Pass cords
through holes in Elite arm end covers. Reassemble arm
and reattach covers.
NOTE: When measuring for length of cords, be
sure to allow enough extra cord to accommodate
tilt and rotation of monitor.
note: CorDS CAn Be DAMAGeD IF JoIntS
Are rotAteD More tHAn 360 DeGreeS.
USe rotAtIon StoP PInS to AvoID DAMAGe.
ADJUsT ROTATION sTOPs
Rotation limits for the
arm are set by placing
stop pins in the holes
where you want the
arm to stop. The stop
pins can be removed
and set by hand.
Rotation
Limiter Ring
Stop Pin