background image

TITAN ELITE CEILING & WALL MOUNT INsTALL

TITAN ELITE INSTALLATION - 09/01/16 pjm

Page 3 of 4

Attach QuickLink & Monitor

Cord Management - Wall Mount

REMOVE ELITE ARM COVERs

END COVERs 

Remove the end covers by 

unscrewing the two 3/4” long 

10-24 flathead screws using a 

Phillips head screwdriver.

TOP COVER

Remove the long arm cover 

by unscrewing the two 1/4” 

long 6-32 flathead screws in 

the center of the cover using 

a Phillips head screwdriver. If 

you use a power tool, be very 

careful not to strip the screws. 

The arm needs to be in a 

vertical position to remove the 

long top cover.

MANAGE CORDs THROUGH ARM - WALL MOUNT

Feed monitor and other cords and any other cords down 

through opening in wall mount. Slip all cords through Titan 

arm, out through end cap and into the back of the Elite arm. 

When running cords through arm, keep them all to one side 

of bolts at Titan arm joints. Pass cords through holes in Elite 

arm end covers. Reassemble arm and reattach covers.

NOTE: When measuring for length of cords, be sure 

to allow enough extra cord to accommodate tilt and 

rotation of monitor.

note: CorDS CAn Be DAMAGeD IF JoIntS Are 

rotAteD More tHAn 360 DeGreeS. USe rotAtIon 

StoP PInS to AvoID DAMAGe.

Rotation

bearing

Rotation

bearing

End cap

End cover

End cover

Top cover

Titan Arm

Wire Management Detail

ADJUsT QUICkLINk TILT

QuickLink

buttons

Pivots

Use the under-monitor handle 

to rotate, tilt and swivel the 

monitor to desired position. 
Increase range of motion by 

depressing buttons on back 

of QuickLink. Each button 

provides 90° of adjustment 

for its corresponding pivot. 

Depressing both buttons 

at once provides 180° of 

adjustment.

ATTACH QUICkLINk TO ARM

9/16 wrench

Nut

Remove nut from bolt 

on QuickLink. Attach 

QuickLink to arm. Thread 

nut onto bolt through front 

of arm assembly. Tighten 

bolt with provided 9/16” 

wrench.

ATTACH VEsA AND HANDLE TO MONITOR

Using a Phillips 

screw driver, attach 

the VESA plate 

to the back of the  

monitor using four 

4mm screws in the 

hardware bag.

Attach handle to 

VESA plate.

Summary of Contents for TITAN ELITE

Page 1: ... four 1 4 x 2 lag bolts provided in hardware bag secure ceiling plate to a solid wood surface or ceiling joist Use square pattern or inline pattern Be sure to use all four bolts Run wires through center hole or wire management port Loosen set screw BEFORE attaching pipe Screw extension pipe into ceiling plate then tighten set screw Wire management holes MOUNT INLINE CEILING PLATE Loosen the set sc...

Page 2: ...G TO PARALINK ATTACH FLIP UP Remove screws from drop extension using 5 32 hex key Align holes in keyboard tray with screw holes in drop extension Attach keyboard tray using the provided screws ATTACH PARALINK Remove beauty cap on Paralink Remove screw using 3 16 hex key Slide keyboard tray into Paralink Replace screw and tighten Replace beauty cap Beauty cap Screw Attach the Paralink Keyboard Moun...

Page 3: ... in Elite arm end covers Reassemble arm and reattach covers Note When measuring for length of cords be sure to allow enough extra cord to accommodate tilt and rotation of monitor NOTE CORDS CAN BE DAMAGED IF JOINTS ARE ROTATED MORE THAN 360 DEGREES USE ROTATION STOP PINS TO AVOID DAMAGE Rotation Bearing Rotation Bearing End cap End cover End cover Top cover Titan Arm Wire Management Detail ADJUST ...

Page 4: ...s head screwdriver Torque Chart In lbs 2 23 2016 Minimum torque values Monitor Mount Arm Base Mount Arm Joint Paralink EV710 Ultra 0 2 1 0 2 1 0 2 1 e t i l E 0 2 1 0 2 1 0 2 1 0 2 1 e t i l E 2 T Titan T2 120 120 120 120 0 2 1 5 8 0 2 1 0 2 1 0 2 1 a r t l U UL180 UL182 120 120 85 MD Arm 140 120 120 Feed monitor and other cords and any other cords down through the ceiling extension pipe Slip all ...

Reviews: