![ICU Eve Mini Owner'S Manual Download Page 8](http://html1.mh-extra.com/html/icu/eve-mini/eve-mini_owners-manual_3532766008.webp)
8
ENGLISH
EN
Installation requirements may vary for different
locations.
NOTICE
When selecting the installation site the following
conditions must be assessed:
• Installation not in potentially explosive atmos-
pheres
• Installation not in flood-prone areas
• Compliance with local technical connection re-
quirements and safety rules
• The mounting surface should have a flat and
sufficiently firm ground
• Humidity maximum 95% (non-condensing)
• Ambient temperature between -25 °C to 40 °C
• Average temperature within 24 hours < 35 °C
• As an installation height: a distance of 75 to 120
cm is recommended from the ground to the lo-
wer housing edge
• The charging socket on the vehicle should be
easily reachable with the tethered charging
cable or the charging cable intended for use.
The charging cable must not be under tension
when it is connected to the vehicle
• It should not be possible to drive over the char-
ging cable
3.3 Mechanical installation
The following tools and materials to install the ICU
Eve Mini:
• Spirit level
• Impact Drill
• Screwdriver for a terminal block
• Pencil and provided drilling template
• Torx T25 (M5)
• Wire Stripper
• Allen key
• 4 x screws M8 x 12 mm
• 4 x nylon plugs type 8
• 4 x screws M5 x 50 mm
• 4 x washer 6.4 mm
• 1x cable gland M32
• 1x cable gland M25
• 1x locknut M32
• 1x seal ring for M25 cable gland
• 1x reduction ring M25
Wall mounting: Drilling using the drilling
template
Please check the indicated dimensions with
a tape measure.
The distance between holes is 144 mm (horizon-
tal) and 312 mm (vertical).
NOTICE
Make sure you keep 75 cm free around the pro-
duct when mounting it on the wall.
NOTICE
1. Cut the drilling template from the cardboard pa-
ckaging
2. Place the template on the desired location
3. Check with a spirit level whether the template is
applied straight
4. Draw the drill holes using the template
5. Drill holes at the marked points
6. Check the drilled holes
Installation of the charging station