BLADE REMOVAL AND INSTALLATION FOR THE FOLLOWING BLADES

BLOWER BLADE  CAUTION: 

THE ENGINE MAY START  SIMPLY BY ROTATING THE

BLADES.  ALWAYS REMOVE THE SPARK PLUG WIRE  PRIOR TO WORKING ON THE
BLADE SIDE  OF THE MOTOR. 

BLADE REMOVAL PROCEDURES

1. Remove the eight bolts holding the front grill in  place and remove the
grill. (

Figure 4.1

2. Remove the three cap screws in the center of the  fan blade bushing
with an 5/32 hex bit (Allen  wrench). (

Figure 4.5

)

3.  Insert the cap screws into the adjoining threaded  holes in the bushing.
(

Figure 4.6

) Turn the screws  in a clockwise manner. Tighten the cap

screws  progressively with the wrench. Evenly tighten  each cap screw ¼
to ½ a turn successively until the blade slides off of the bushing. (

Figure

4.7

4. Insert a small screwdriver into the
bushing slot  to release the bushing
from the engine shaft.  Be careful not
to damage the end of  the jackshaft.  Remove the bushing and
blade. 

BLADE INSTALLATION

1. Put bushing on motor shaft then tighten the  allen screw on the bushing.  Put blade on bushing  (

Fig. 4.7

).  Put

lock washers on the three allen  screws and insert into drilled holes of blade.  Turn  each screw and tighten
evenly.

2. Reinstall front grill.

-7-

Summary of Contents for EB-16-VSG

Page 1: ...lade and cutting surface ICS has since established ourselves as a leader and innovator in the air movement and dust control industry About This Manual This manual is produced solely for the use of pur...

Page 2: ...ic blower If such defects occur this warranty is void if service is attempted by non Authorized Service Depots Power Blower Data 4 Power Blower Electrical Information 5 OPERATION Operating Procedures...

Page 3: ...make sure the tank cap is closed properly and secured If any fuel is spilled make sure the area is dry before starting the engine 10 Never operate gasoline powered blowers in an enclosed or confined...

Page 4: ...ectric motors are single phase 60 Hz rigid base 56 frame with ball and bearings and manual reset overload protection ELECTRIC UNITS ENGINE HP CFM S B RPM WIDTH DEPTH HEIGHT LBS EBS 16 ELECTRIC 1 3 TEF...

Page 5: ...ntilation of the entire structure For additional information on how to accomplish PPV refer to PPV Set Up Procedures in this Manual Note The Industrial Power Blower is the most efficient tool for PPV...

Page 6: ...belt 1 Remove the eight bolts holding the front grill in place and remove the grill Figure 4 1 2 Loosen the four front engine mount bolts Figure 4 2 3 Use a lever to pry or push the engine downward to...

Page 7: ...into the adjoining threaded holes in the bushing Figure 4 6 Turn the screws in a clockwise manner Tighten the cap screws progressively with the wrench Evenly tighten each cap screw to a turn successiv...

Page 8: ...two bolts drawing the bushing and hub together 4 Slide the blade onto the bushing hub assembly and insert the three screws through the blade and turn evenly but do not tighten Make sure blade is in li...

Page 9: ...igure 5 1 If the blower is too close to the opening the opening will not be completely covered by pressurized air If the blower is too far from the opening pressurized air will strike the building aro...

Page 10: ...r combined ability to cover the larger opening with pressurized air The size of the opening dictates the numbers of blowers necessary to cover the opening with combined cones of pressurized air Rememb...

Page 11: ...s dependent on direction and velocity As in any ventilation operation maximum efficiency can be obtained by using the prevailing wind direction to advantage by pressurizing the structure on the windwa...

Reviews: