background image

Figure 4.2

Figure 4.3

Figure 4.4

Maintenance Procedures 

 

Proper maintenance is necessary to ensure that your Industrial

Power Blower operates as efficiently and trouble-free as possible. By  following the instructions in this
section you will  be providing the maintenance needed to achieve this goal.  

BELT ADJUSTMENT 

The blower drive belt has been adjusted at the  factory prior to delivery. However,
the belt should  be inspected and checked after the initial three (3)  hours of
operation as it may require re-tightening  due to belt stretch.  It should be inspected
after every 25 hours of operating time.
Operating the blower with a loose belt will cause excessive wear   and reduce
performance.  Follow the procedures  listed to properly adjust the drive belt. 

1.  Remove the eight bolts holding the front grill in  place and remove the grill.            
    (

Figure 4.1

2.  Loosen the four front engine mount bolts.    
    (

Figure 4.2

3.  Use a lever to pry or push the engine
downward to  tighten the belt (s). (

Figure 4.3

)

The belt(s) should  be snug and have very
little play.  DO NOT  OVERTIGHTEN THE BELT(S).

4.  Tighten the front engine mount bolts. On
the  Honda 13 HP models the rear mounting
studs  must also be tightened. 

5.  Re-install the front grill and test the blower.

BELT REPLACEMENT 

1. Remove the eight bolts holding the front grill in  place and remove the grill.
(

Figure 4.1

2. Loosen the four front engine mount bolts. 

3. Pry the engine up to loosen and remove the  belt(s). (

Figure 4.4

4. Use a lever to pry or push the engine downward to  tighten the belt (s). The belt(s) should be snug
and  have very little play.  DO NOT OVERTIGHTEN THE BELT (S).  

5. Tighten the front engine mount bolts.  

6.  Re-install the front grill and test the blower.

Figure 4.1

-6-

Summary of Contents for EB-16-VSG

Page 1: ...lade and cutting surface ICS has since established ourselves as a leader and innovator in the air movement and dust control industry About This Manual This manual is produced solely for the use of pur...

Page 2: ...ic blower If such defects occur this warranty is void if service is attempted by non Authorized Service Depots Power Blower Data 4 Power Blower Electrical Information 5 OPERATION Operating Procedures...

Page 3: ...make sure the tank cap is closed properly and secured If any fuel is spilled make sure the area is dry before starting the engine 10 Never operate gasoline powered blowers in an enclosed or confined...

Page 4: ...ectric motors are single phase 60 Hz rigid base 56 frame with ball and bearings and manual reset overload protection ELECTRIC UNITS ENGINE HP CFM S B RPM WIDTH DEPTH HEIGHT LBS EBS 16 ELECTRIC 1 3 TEF...

Page 5: ...ntilation of the entire structure For additional information on how to accomplish PPV refer to PPV Set Up Procedures in this Manual Note The Industrial Power Blower is the most efficient tool for PPV...

Page 6: ...belt 1 Remove the eight bolts holding the front grill in place and remove the grill Figure 4 1 2 Loosen the four front engine mount bolts Figure 4 2 3 Use a lever to pry or push the engine downward to...

Page 7: ...into the adjoining threaded holes in the bushing Figure 4 6 Turn the screws in a clockwise manner Tighten the cap screws progressively with the wrench Evenly tighten each cap screw to a turn successiv...

Page 8: ...two bolts drawing the bushing and hub together 4 Slide the blade onto the bushing hub assembly and insert the three screws through the blade and turn evenly but do not tighten Make sure blade is in li...

Page 9: ...igure 5 1 If the blower is too close to the opening the opening will not be completely covered by pressurized air If the blower is too far from the opening pressurized air will strike the building aro...

Page 10: ...r combined ability to cover the larger opening with pressurized air The size of the opening dictates the numbers of blowers necessary to cover the opening with combined cones of pressurized air Rememb...

Page 11: ...s dependent on direction and velocity As in any ventilation operation maximum efficiency can be obtained by using the prevailing wind direction to advantage by pressurizing the structure on the windwa...

Reviews: