F/N 525746 Jan 09
© 2009 ICS, Blount Inc.
TITLE
680GC OPERATOR’S MANUAL
11
SET-UP
Note 1: Be aware that the guide bar rails may develop sharp edges over time so always pull the
diamond chain by the diamond segments.
Note 2: Do not “over tension” the diamond chain. Loss of power will result. It is normal for the
drivelinks to hang underneath the guide bar. The diamond chain should be tight but be able to be
pulled around the guide bar by hand.
Note 3: To prevent chain tensioner breakage, be sure the side cover nuts are tightened to
approximately 20 ft-lbs (27Nm).
GUIDE BAR AND DIAMOND CHAIN INSTALLATION
STEP 10
Continue to lift up on the nose of the guide
bar and firmly tighten the side cover nuts.
NOTE: To prevent chain tensioner
breakage, be sure the side cover nuts
are tightened to approximately 20 ft-lbs
(27 Nm).
STEP 11
Attach to water source with pressure of not
less than 20 psi (1.5 bar).
Summary of Contents for 680GC
Page 1: ...F N 525746 Jan 09 2009 ICS Blount Inc 680GC OPERATOR S MANUAL ...
Page 2: ......
Page 26: ......
Page 27: ......