![ICS Schneider Messtechnik IPT-2x Instruction Manual Download Page 34](http://html1.mh-extra.com/html/ics-schneider-messtechnik/ipt-2x/ipt-2x_instruction-manual_3539009034.webp)
34
6 Set up with the display and adjustment module
WIKA Operating Instructions - Process pressure transmitter IPT-2x
3. Set the requested mbar value with
[+]
and store with
[OK]
.
For an adjustment with pressure, simply enter the actual measured
value indicated at the bottom of the display.
If the adjustment ranges are exceeded, the message "
Outside param-
eter limits
" appears. The editing procedure can be aborted with
[ESC]
or the displayed limit value can be accepted with
[OK]
.
The span adjustment is finished.
Proceed as follows:
1. Select the menu item "
Setup
" with
[->]
and confirm with
[OK]
.
Now select with
[->]
the menu item "
Adjustment
", then "
Min.
adjustment
" and confirm with
[OK]
.
2. Edit the percentage value with
[OK]
and set the cursor to the
requested position with
[->]
.
3. Set the requested percentage value (e.g. 10 %) with
[+]
and save
with
[OK]
. The cursor jumps now to the pressure value.
4. Enter the pressure value corresponding to the min. level (e.g.
0 mbar).
5. Save settings with
[OK]
and move with
[ESC]
and
[->]
to the max.
adjustment.
The min. adjustment is finished.
For an adjustment with filling, simply enter the actual measured value
indicated at the bottom of the display.
Proceed as follows:
1. Select with
[->]
the menu item Max. adjustment and confirm with
[OK]
.
2. Edit the percentage value with
[OK]
and set the cursor to the
requested position with
[->]
.
3. Set the requested percentage value (e.g. 90 %) with
[+]
and save
with
[OK]
. The cursor jumps now to the pressure value.
4. Enter the pressure value for the full vessel (e.g. 900 mbar) cor-
responding to the percentage value.
5. Save settings with
[OK]
The max. adjustment is finished.
Min. adjustment level
Max. adjustment level