background image

 

PM-3112-240-MTCP  2 Loops single-phase Smart Power Meter- QuickStart (Oct/2019)  

ICP DAS USA, Inc.

 

www.icpdas-usa.com

 | 1-310-517-9888 | 24309 Narbonne Ave. Suite 200. Lomita, CA 90717

 

 

2.2. Product Warranty & Customer Support  

ICP DAS warrants all products free from defects in material and workmanship for a period of 

one year from the date of shipping. During the warranty period, we will, at our position, either 

repair or replace any product that proves to be defective.  
To report any defect, please contact 

+310-517-9888 or 

[email protected]

  

 

2.3. Limitation of Warranty  

This warranty does not apply to defects resulting from unauthorized modification, misuse, or 

use for reason other than electrical power monitoring. The supplied meter is not a user-

serviceable product.

 

 

3. Installation  

Please use the soft dry clothes to clean the instrument.  

Please do not use any chemical or detergent or volatile solvents to clean the instrument, in order to 

avoid any possibility of the cover damage.  

 

3.1.  

 

Dimension: 127mm

length

× 33mm

wide

× 105mm

high

 

 

Products come with external split type clip-on CT’s. Disconnect the CT’s or use other CT’s is 

highly prohibited.  

 

Please read this operation manual carefully before using.  

 

Please re-confirm the measure position.  

 

Reconfirm the RST (ABC) phase sequence of the power system.  

 

PM-3133 series can be installed as rail mounting mode or embedded, no need to drill a hole or 

screw to fix it (rail mounting width can up to the length of 35 mm).  

 

Meter auxiliary power for PM-311x series is DC +12V ~+48V or DC +10V ~ +30V (For PM- 311x-
xxxC). 
 
 

 

 

 

Summary of Contents for PM-3112-240-MTCP

Page 1: ...s range 10 300 VAC which allow s worldwide compatibility And with 2 channels relay output it can be linked with sirens or lightings for alarm messages It also supports Modbus R TU Modbus TCP or CAN bu...

Page 2: ...her than electrical power monitoring The supplied meter is not a user serviceable product 3 Installation Please use the soft dry clothes to clean the instrument Please do not use any chemical or deter...

Page 3: ...t disconnect the CT with its original meter and mix use with each other Since each set of smart meter PM 311x series and its attached split type clip on CT are calibrated set by set The mix use may ca...

Page 4: ...PM 3112 240 MTCP 2 Loops single phase Smart Power Meter QuickStart Oct 2019 ICP DAS USA Inc www icpdas usa com 1 310 517 9888 24309 Narbonne Ave Suite 200 Lomita CA 90717 4 3 4 Connection...

Page 5: ...2 240 MTCP 2 Loops single phase Smart Power Meter QuickStart Oct 2019 ICP DAS USA Inc www icpdas usa com 1 310 517 9888 24309 Narbonne Ave Suite 200 Lomita CA 90717 5 3 5 CT s installation steps 3 6 W...

Page 6: ...put LED Indicator Relay Output LED Indicator The PM 311x as 4 LED to indicate the unit power status communication and power data calculation RUN Green light up after communication ready LED will flash...

Page 7: ...PM 3112 240 MTCP 2 Loops single phase Smart Power Meter QuickStart Oct 2019 ICP DAS USA Inc www icpdas usa com 1 310 517 9888 24309 Narbonne Ave Suite 200 Lomita CA 90717 7...

Page 8: ...PM 3112 240 MTCP 2 Loops single phase Smart Power Meter QuickStart Oct 2019 ICP DAS USA Inc www icpdas usa com 1 310 517 9888 24309 Narbonne Ave Suite 200 Lomita CA 90717 8...

Reviews: