Users Manual
IC
2
IC2-FR-WR Assembly (Weather Resistant Fixed Installation)
1) Unpack the individual enclosures and associated hardware.
2) Pre stage your array on a clean non-abrasive padded surface such as carpet by laying
the enclosures in position face down on the carpet. A small gap of less than 1/4” (6.35 mm)
between the enclosures is normal.
3) Unpack the metal hanging hardware/side straps, the “NEW” M10 x 50mm bolts the wrench
and the liquid thread lock
4) Remove and discard the eight M10 x 35mm bolts on from each end of the enclosure.
Do
not remove the M10 bolts from the top and bottom of the enclosure.
5) Hold the hanging hardware in place against the side of the array,inserrt and finger tighten
the new M10 x 50mm bolts in place. Be certain to use the liquid tread locker to ensure the
bolts to not back out during operation and create a water tight seal.
6) Adjust the individual enclosures placement as necessary to ensure the bolts align properly.
If the enclosures are not aligned properly there is a risk of cross threading the bolts.
7) Repeat steps 5 & 6 for each side strap.
8) Tighten all M10 bolts to their final tightness using the tool provided with them
9) Done.
7
Hang Points
Completed weather resistant array
with side straps and front grilles
in place
Pull back points
Hang points
Do not remove these bolts