ICON PARACHUTE SYSTEM (IPS) / EXTRACTION ROCKET
19-27
CHANGE C1
ICON A5 / MAINTENANCE MANUAL
CHAP
TER
19
FIGURE 19-18
90° ROCKET ASSEMBLY
4.
The rocket lanyard is already attached to the deployment bag at BRS Aerospace. The rocket
lanyard will need to be routed and attached to the BRS 601 rocket in the ICON A5 rocket bay.
Once the required length of lanyard is determined, the remaining length should be “looped” and
secured with the small cable ties supplied. The rocket lanyards should be routed alongside of,
rather than over the top of the rocket. They MUST NOT be routed under any harness or struc-
ture. Coil the lanyards without knotting them. Place the two cable ties around the lanyards so that
they can be neatly stowed.
FIGURE 19-19
SECURING ROCKET COLLAR LANYARD AND INCREMENTAL HARNESS
5.
Ensure that the opposite end of the incremental harness, shown in under the left side flap, is
connected to the deployment bag with a Lark’s head knot.
Summary of Contents for A5
Page 4: ...IV TABLE OF CONTENTS ICON A5 MAINTENANCE MANUAL ISSUE C3...
Page 112: ...3 60 INSPECTIONS SYSTEM SPECIFIC INSPECTIONS ICON A5 MAINTENANCE MANUAL CHANGE C2 CHAPTER 3...
Page 342: ...9 106 FLIGHT CONTROLS YAW CONTROLS ICON A5 MAINTENANCE MANUAL CHANGE C3 CHAPTER 9...
Page 398: ...11 20 FUSELAGE AND VERTICAL TAIL WATER RUDDER ICON A5 MAINTENANCE MANUAL CHANGE C1 CHAPTER 11...
Page 420: ...12 22 HORIZONTAL TAIL HORIZONTAL TAIL TIP PIN ICON A5 MAINTENANCE MANUAL CHANGE C1 CHAPTER 12...
Page 608: ...14 100 LANDING GEAR AFT NOSE LANDING GEAR DOOR ICON A5 MAINTENANCE MANUAL CHANGE C2 CHAPTER 14...
Page 627: ...PROPULSION 16 3 CHANGE C2 ICON A5 MAINTENANCE MANUAL CHAPTER 16 Install Spinner Dome 16 106...
Page 658: ...16 34 PROPULSION ENGINE ICON A5 MAINTENANCE MANUAL CHANGE C2 CHAPTER 16 FIGURE 16 20...
Page 659: ...PROPULSION ENGINE 16 35 CHANGE C2 ICON A5 MAINTENANCE MANUAL CHAPTER 16 THROTTLE ASSEMBLY...
Page 732: ...16 108 PROPULSION PROPELLER ICON A5 MAINTENANCE MANUAL CHANGE C2 CHAPTER 16...