FLIGHT CONTROLS / ROLL CONTROLS
9-27
CHANGE C3
ICON A5 / MAINTENANCE MANUAL
CH
AP
TER 9
FIGURE 9-20
LOCATION OF SECONDARY ROLL STOP
21.
Install seatbelt reel cover, left hand and right hand baggage sidewalls, and baggage headliner. If
the overhead console was removed, re-install.
22.
Install baggage floor boards using hardware retained during removal. (See “Baggage Floor Instal-
lation” on page 3-42.)
23.
Install seat back and seat pan using hardware retained during removal.(See “Seat Back Installa-
tion” on page 3-51.)(See “Seat Pan Installation” on page 3-53.)
24.
Install cockpit floor boards.(See “Cockpit Floor Board Installation” on page 3-47.)
25.
Install aileron access panel using retained fastening hardware.
V
ERIFICATION
M
ETHOD
:
Conduct the Inspect Roll Rigging procedure (See “Inspect Roll Rigging” on page 9-17.) to verify proper
rigging.
FWD Pitch Sector Rig Pin Hole
Secondary Stop
Control Stick Rig Pin Hole
Summary of Contents for A5
Page 4: ...IV TABLE OF CONTENTS ICON A5 MAINTENANCE MANUAL ISSUE C3...
Page 112: ...3 60 INSPECTIONS SYSTEM SPECIFIC INSPECTIONS ICON A5 MAINTENANCE MANUAL CHANGE C2 CHAPTER 3...
Page 342: ...9 106 FLIGHT CONTROLS YAW CONTROLS ICON A5 MAINTENANCE MANUAL CHANGE C3 CHAPTER 9...
Page 398: ...11 20 FUSELAGE AND VERTICAL TAIL WATER RUDDER ICON A5 MAINTENANCE MANUAL CHANGE C1 CHAPTER 11...
Page 420: ...12 22 HORIZONTAL TAIL HORIZONTAL TAIL TIP PIN ICON A5 MAINTENANCE MANUAL CHANGE C1 CHAPTER 12...
Page 608: ...14 100 LANDING GEAR AFT NOSE LANDING GEAR DOOR ICON A5 MAINTENANCE MANUAL CHANGE C2 CHAPTER 14...
Page 627: ...PROPULSION 16 3 CHANGE C2 ICON A5 MAINTENANCE MANUAL CHAPTER 16 Install Spinner Dome 16 106...
Page 658: ...16 34 PROPULSION ENGINE ICON A5 MAINTENANCE MANUAL CHANGE C2 CHAPTER 16 FIGURE 16 20...
Page 659: ...PROPULSION ENGINE 16 35 CHANGE C2 ICON A5 MAINTENANCE MANUAL CHAPTER 16 THROTTLE ASSEMBLY...
Page 732: ...16 108 PROPULSION PROPELLER ICON A5 MAINTENANCE MANUAL CHANGE C2 CHAPTER 16...