To make assembly easier, carefully read the
following assembly tips:
• Assembly requires two persons.
• Place all parts in a cleared area and remove the
packing materials. Do not dispose of the packing
materials until the vibration platform is fully
assembled.
• See the drawings below to identify small parts
used in assembly.
Note: If a part is not in the
hardware kit, check to see if it has been
preattached.
• Tighten all parts as you assemble them.
• Assembly may require the following tools (not
included):
one adjustable wrench
one rubber mallet
one Phillips screwdriver
Assembly will be more convenient if you have a
socket set, a set of open-end or closed-end
wrenches, or a set of ratchet wrenches.
To avoid
damaging plastic parts, do not use power tools.
M8 Split Washer (F)
M8 Washer (O)
M6 Split Washer (M)
M8 Acorn Nut (P)
M8 x 48mm Screw (E)
M5 x 14mm
Screw (G)
M6 x 16mm
Screw (H)
M6 x 20mm
Screw (L)
6
1. Orient the Lower Upright (B) so that the lower
control panel is facing the platform.
While a second person holds the Lower Upright
(B) near the Base (A), plug the upright wire into
the indicated jack in the Base.
Next, insert the Lower Upright (B) into the Base
(A).
1
Lower
Control
Panel
Jack
A
Upright
Wire
Platform
B
ASSEMBLY