7
STEP 2
Install the Handlebar Post
Connect the Sensor wire (17) to the Connective
wire (18) from the Handlebar post (4).
Put the end of Tension controller (20) into the
spring hook of Tension cable (16) as Picture
shown.
Finally, insert the Handlebar post (4) to the Main
frame (1) and secure with the Allen bolt (19) and
Arc washer (36).
STEP 1
Install the Front and Rear Stabilizers
Fix the Front stabilizer (2) and Rear stabilizer (3)
to the Main frame (1) with the Carriage bolt (13),
Arc washer (14) and Acorn nut (15).
STEP 3
Install the Saddle Post
Fix the Saddle (6) to the Saddle post (24) with Flat
washer (32) and Nylon nut (33), and then insert
the Saddle post (24) with Saddle into the Main
frame (1), tighten with the Knob (10).
Note: When adjusting the height of saddle post,
the maximum insert depth mark line cannot be
higher than the edge of the tube of Main Frame
section.
Summary of Contents for WESLO CITY BI
Page 15: ...15 EXPLODED DRAWING ...
Page 16: ...16 EXPLODED DRAWING ...