6
CONNECTIONS AND MAINTENANCE
27
Opening the transceiver case
(Fig. 1)
Apply 4 to 6 kg torque
when replacing screws.
UX-120 installation
(Fig. 3)
Supplied with the UX-120.
Be careful not to shift
the connector.
UT-79 installation
(Fig. 2)
UT-79
Remove these
in advance,
then attach the
UT-79.
Attach the operating
sticker here.
OPC-457 installation
(Fig. 4)
➂
Connect onto the
UX-120.
➀
Remove the plastic
cover.
➁
Pass the cable
through, then
tighten the cable
nut.