4
ATTACHING THE WHEELS:
6A
Place one axle bearing (Item 5A) into the hole shown at
the bottom of the lower frame (7).
5
Take the stand (Item 3) and place it into the protruding
M6x60 bolts (x4) (Item 5F). Tighten with the M6 nuts
(x4) (Item 5G).
6
Rotate the hopper body (9) to the position shown. Place
the gear box and impellor (4) in the center hole of the
hopper body (9), let it rest there.
Make sure the arrow
on the gearbox faces forwards. The arrow should point
away from the stand (3).
6B
Feed the axle (6) through the hole without the axle
bearing (Item 5A), push it through the hole in the centre
of the gearbox and through the hole (Item 5A) on the
other side.
Note:
The axle and gearbox are now in position. There
are two holes on the axle. One hole is closer to the
middle of the axle and the other hole is closer to the
edge of the axle. When attaching the wheels: one wheel
will be pinned on the inside of the wheel and the other
will be pinned on the outside of the wheel.
NOTE
6C
Push the other axle bearing (Item 5A) into position.
Assembling your
AccuPro ONE
9
5A