icherng WA Series User Manual Download Page 9

 

 

3.5 Refrigerant Piping 

*  Refrigerant piping must be done by professional 

technician and follow the national codes. 

* If the suction line has to raise up over the unit cooler, 

raising tube must with an oil trap to make sure good 
oil return 

* Horizontal suction line should pitch down from unit 

cooler to compressor.    Suction line should be 
insulated to prevent condensate water.   

*  Refrigerant line should be as short as possible to 

reduce pressure drop. 

 

a. In order to prevent moisture entering unit cooler, the 

unit cooler is sealed with pressurized dry gas.    Before 

brazing connection tube, use copper tube cutter to cut a 

slit for exhausting sealed gas.   

Be careful for the 

ejected gas or tube scraps. Wear  personal safety 

protecting equipment while working.

   

b. When the unit cooler reaches to the zero pressure status, 

deburr the tube ends and expand tube end for brazing.   

For the good cleanness inside the system, use dry 

nitrogen to purge the oxygen out.    This will prevent 

forming oxide inside during brazing. 

c.  When finish connecting all the components, perform 

leak test and vacuuming.    Make sure there is no leak 

and reach the required vacuum level.    It’s very 

important for steady system operating. 

d.  When installation job is done, the expansion valve 

should be set to correct super heat in test running.    For 
the best performance of unit cooler and preventing the 
liquid compressed in compressor

the super heat 

adjustment must be executed at the lowest evaporating 
temperature of system design value.    For temperature 
difference between evaporating and room temperature 
at 6~7

o

C, adjust the super heat around 2.8~3.5

 o

C.  For 

temperature difference between evaporating and room 
temperature at 8

o

C, adjust the super heat around 5

 o

C. 

  3.5  冷媒配管

 

配管必須符合國家相關法規與系統實際操作需求。

並由專業技術人員執行。

 

如果吸氣管必須要拉高超過蒸發器組的連接位置

時,升管的底部必須要接一個集油彎,解決回油
問題。

 

水平的吸氣回管應由蒸發器斜向壓縮機。吸氣管應

做適當的保溫,避免產生冷凝水。

 

冷媒管路盡可能保持短,以降低管路壓損。

 

a. 

為確保蒸發器管路內部保持乾燥,出廠前內部會

充填乾燥氣體。焊接前,請用切管刀小心將銅管

切開一個小縫,讓蒸發器內部氣體排出。

注意

切管時應注意噴出氣體或銅管碎屑,工作時請穿

戴個人安全防護裝備。

 

b. 

當蒸發器達到零壓力後,開始進行銅管切口去毛

邊與擴口準備焊接。為維持管內的潔淨,焊接前

請先以氮氣掃除原管內的氧氣,焊接時請以微量

氮氣充入管內進行焊接,以避免管內氧化!

 

c. 

當連接完成所有的管路後,進行測漏與抽真空。

確認系統無洩漏且達到所需要的真空度。此對於

日後系統穩定運轉是十分重要。

 

d. 

在安裝完成後,膨脹閥必需要調整達到系統所要的

過熱度。為獲得完整的蒸發器能力,在系統操作

的最低蒸發溫度下將膨脹閥調整適當的過熱度。

建議在

6

7

T.D.

的系統調整到

2.8

3.3

℃的過

熱,在

8

T.D.

的系統

 

調整到

5

℃的過熱。

 

 

 

 

 

 

 

 

To Compressor 

至壓縮機 

External equalizer line   

外部均壓管

 

Thermal Bulb   

感溫胞

 

Place thermal bulb in front of external equalizer 
line to avoid liquid from external equalizer line 
interfering temperature detection of thermal 
bulb. 

將感溫胞配置於外部均壓管的前方以避免由均
壓管過來的液態冷媒影響到感溫胞的感應。 

Summary of Contents for WA Series

Page 1: ......

Page 2: ......

Page 3: ...ning unit cooler 3 3 3 Locate 4 3 4 Drain Line 4 3 5 Refrigerant Piping 5 3 6 Wiring 6 Wiring diagrams 7 4 Test running and adjustment 8 4 1 Before start up 8 4 2 Check and adjust while running 8 5 Ma...

Page 4: ......

Page 5: ...t or stand on the container Never overstock the containers Store product in cool and dry place If corrugated cardboard gets wet please remove the wet corrugated cardboard as soon as possible The wet c...

Page 6: ...on the ground please keep it vertically with cardboard under and prevent falling down The pallet package comes with a black adjustable belt Once take one unit out please use this belt to retighten th...

Page 7: ...opened otherwise it will accumulate heavy condensate on coil surface Thus will block air flow tunnel of unit cooler 3 Make sure there is no obstacle in front of fan s Must reserve space to build up be...

Page 8: ...ain line should be pitched at 100mm per 300mm When room temperature is above 2o C the drain line should be pitched at 25mm per 300mm For frozen condition should install drain line heater prepared by u...

Page 9: ...ness inside the system use dry nitrogen to purge the oxygen out This will prevent forming oxide inside during brazing c When finish connecting all the components perform leak test and vacuuming Make s...

Page 10: ...erminal box cover c Connect fan motor to power source check if rotation direction is correct d If model comes with defrosting heaters wire the heaters as illustrated on wiring diagram e For safety rea...

Page 11: ...e screw driver inserted the clamp inside is opened 2 3 Insert the electric wire into the connection hole 3 4 Remove screw driver the wire is clamped Check the wire if clamped firmly 4 WAGO is a trade...

Page 12: ...ulb is well strapped Insulate the thermal bulb from being affected by surrounding temperature 4 2 Check and adjust while running In order to keep system in steady running must adjust well in test runn...

Page 13: ...drain pan and drain line to avoid clogging c Clean fan blades and air streamer fan guard If fan blades are damaged or bent replace with new ones d Check every electrical connection is fastened Also ch...

Page 14: ...d is too low 1 Motor is out of order 2 Incorrect power source 3 Air tunnel blocked by ice 1 Replace a new one 2 Check the power source and fix it 3 Move the ice check defrosting system Fan does not ru...

Page 15: ...fan frame 4 Remove four M4 2 screws of fan guard Take the whole fan set down 5 Cut off the power line change new fan set or replace broken motor only Drain hole of motor must face down Be careful do n...

Page 16: ...12 Memo...

Page 17: ...13 Appendix 1 Replacement Parts Fan Set Assembly Fan Set Motor Fan Blade Motor Support Air blade AARJJ AACKW AAHDK AAHKP AAHKQ Appendix 2 Connection pipe position...

Page 18: ...ge without notice I Cherng Refrigeration Industrial Co Ltd Heat Exchanger Taiwan No 12 Chu Kuang 1st St Daliao Dist Kaohsiung City 83164 Taiwan 12 Tel 07 7873666 Fax 07 7872999 Website www icherng com...

Reviews: