QD-ENG-40 REV.3
- 4 -
1.
The shipping container leaves the factory banded to a pallet with red arrows imprinted on the box.
These red arrows should be pointing in the proper (upward) direction.
The Ice Qube TMS is
position sensitive and should remain in an upright position at all times.
If the Ice Qube air
conditioner should arrive
not
banded to a pallet and
not
in the proper upright position with red
arrows pointing upward, the shipment may have been damaged and you may wish to consider
contacting the freight carrier for instructions on filing a claim.
Note: Operating the unit before maintaining an upright position for 24 hours will void all warranties.
2. Check for any damage to the shipping container. If the shipping container has been damaged or
marred in any way, carefully check to see if the Ice Qube TMS incurred any damage. Check for
scratches, dents, rattles (which may indicate loose components), the presence of oil, and any
other irregularities. Any evidence of damage will need to be recorded on the freight bill and
reported to the carrier. The freight carrier will provide instructions on filing a claim.
Ice Qube
cannot accept responsibility for damages that occur during shipping.
PRE-INSTALLATION TEST:
Before installing the Ice Qube system on the enclosure, it is recommended the unit operate for 20 to
30 minutes to ensure it is functioning properly. Although the Ice Qube TMS has been tested at the
factory, internal damage may have occurred during shipping which may have not been apparent
during the unpacking inspection.
1. Place the system on a solid base such as a workbench or table. Check that the weight of the
unit will be supported. Be sure to allow adequate space for airflow. There are two air streams
that must not be restricted, the cool air stream and the warm air stream.
Figure 2
2.
Check that the warm air system filter is in place, location varies with model type. See spec
drawing for location.
Models with the optional rain or wash down hood do not have a warm air filter and will require
regular routine condenser maintenance
.
3. Check the data tag for proper electrical requirements. The data tag lists the design voltage and
amperage requirements of the system. Verify that the electrical supply where the system will be