Figure 5: Power Terminal Block (optional) 

Operating Your System 

 

Once the Ice Qube TMS has been installed onto the enclosure and the power cable has been attached to a 
properly grounded electrical connection with adequate voltage and current supply, the unit is ready for 
operation. As soon as electrical power is supplied to the Ice Qube TMS, both fans will begin to move air 
through the MSCCT heat exchanger. 

Fan Speed Controller (Ord Loc Only) 

Version 1.4 

 

Ice Qube offers an optional fan speed controller that requires an input voltage in the range of 24 through 
250 AC or DC. Check the model label for the proper voltage requirements of the heat exchanger. For either 
AC or DC voltages, (+) is positive or “hot” and (-) is negative or “neutral”, the power connection is polarity 
sensitive. Be careful when handling or adjusting the controller as all components and circuitry are at line 
voltage except for the alarm outputs which are dry contacts. 
 
When power is applied to the heat exchanger, the fan speed controller will automatically sequence through 
a diagnostic procedure that will check the operation of the fans and the optional alarm relay. Following s 
the test sequence. 
 

Test Mode 

FAN 1 comes ON. If PWM type, FAN 1 starts at minimum speed and ramps up to full speed over a 25 
second period with its LED blinking faster during the period. Upon achieving full speed, fan will operate at 
full speed for 15 seconds. Then FAN 1 goes OFF. LED 1 pulses once per 2 seconds when the fan is off. 
 
If single speed, the fan will operate for forty seconds, LED ON when FAN is ON. Then FAN 1 goes OFF. 
LED 1 pulses once per 2 seconds. Pause for 3 seconds. 
 

Summary of Contents for IQ10000HE

Page 1: ...Nonhazardous Locations OPERATION AND INSTALLATION MANUAL IMPORTANT PLEASE READ this manual and follow the instructions for safe and satisfactory installation and operation of this system Keep this ma...

Page 2: ...9 Fan Speed Controller Ord Loc Only 9 Maintenance 11 Trouble Shooting 11 Schematic Wiring Diagram 13 Specification Drawings 14 IQ700HE 14 IQ800HE 15 IQ900HE 16 IQ2200HE 17 IQ6100HE 18 IQ7400HE 19 IQ10...

Page 3: ...veral systems that function simultaneously to maintain environmentally friendly conditions for your equipment within the enclosure The three main thermal related systems that we employ are the closed...

Page 4: ...changer will be 1 Operation manual 2 Mounting hardware 3 Standard master warranty 4 Enclosure gasket Storage The storage space temperature should be in the range of 40 to 85 C 40 to 185 F in a non con...

Page 5: ...point Factory set points Enclosure 70 F Ambient 90 F Fan speed controller option available for Ord Loc Only 4 After completing the above check point the Ice Qube TMS is ready to be mounted to your enc...

Page 6: ...unting studs through the 3 8 9 5mm or 1 2 12 7mm depending on model holes in your enclosure and check to see that all openings are aligned 3 After checking that all openings and bolt holes are in alig...

Page 7: ...heck that wire routing to the terminal box will not interfere with or become damaged by other components Electrical Installation 1 Check that the heat exchanger designated power supply is de energized...

Page 8: ...8 Rev 6 Figure 3 Terminal Cover Figure 4 Terminal Block optional...

Page 9: ...e or hot and is negative or neutral the power connection is polarity sensitive Be careful when handling or adjusting the controller as all components and circuitry are at line voltage except for the a...

Page 10: ...s set at 10 F from the factory Differential 1 2 3 5 5 Off Off Off Off 10 Off On Off On 15 On Off On Off 20 On On On On Each fan has an LED that will indicate the status of the fans Normally with power...

Page 11: ...xcess water from the filter before returning it to the system Replace the filter if it shows signs of deterioration See website for air filter cleaning demonstration at http www iceqube com ice qube t...

Page 12: ...rating Yes No Is the enclosure door closed tightly Yes No Are all of the gaskets in place Yes No Has the ambient warm air stream filter been cleaned or changed recently If applicable Yes No Is the sys...

Page 13: ...13 Schematic Wiring Diagram Figure 6...

Page 14: ...14 Rev 6 Specification Drawings IQ700HE Figure 7...

Page 15: ...15 Rev 6 IQ800HE Figure 8...

Page 16: ...16 Rev 6 IQ900HE Figure 9...

Page 17: ...17 Rev 6 IQ2200HE Figure 10...

Page 18: ...18 Rev 6 IQ6100HE Figure 11...

Page 19: ...19 Rev 6 IQ7400HE Figure 12...

Page 20: ...20 Rev 6 IQ10000HE Figure 13...

Page 21: ...21 Rev 6 Gasket and Cutouts IQ700 800HE Gasket and Cutout Same Gasket and Cutout for IQ700HE and IQ800HE Figure 14...

Page 22: ...22 Rev 6 IQ900HE Gasket and Cutout Figure 15...

Page 23: ...23 Rev 6 IQ2200HE Gasket and Cutout Figure 16...

Page 24: ...24 Rev 6 IQ6100HE Gasket and Cutout Figure 17...

Page 25: ...25 Rev 6 IQ7400HE Gasket and Cutout Figure 18...

Page 26: ...26 Rev 6 IQ10000HE Gasket and Cutout Figure 19...

Page 27: ...ility or any other theory of liability will be limited to the lesser of customer s actual damages or the price paid by customer to Ice Qube for the Products not including applicable taxes duties and f...

Page 28: ...es be deemed to be non binding Such advice does not relieve customer from the obligation and customer accepts full responsibility to confirm for itself the suitability of the Products for their intend...

Page 29: ...29 Rev 6 Notes...

Reviews: