Pre-Installation Test
Before installing the Ice Qube system on your enclosure, Ice Qube recommends that the unit operates for 5-
10 minutes to ensure it is functioning properly. Although the Ice Qube TMS has been tested at the factory,
internal damage may have occurred during shipping which may have not been apparent during the
unpacking inspection.
1.
Place the system on a solid base such as a workbench or table. Ensure that the weight of the unit
will be supported. Be sure to allow adequate space for airflow. The cold air supply stream and the
heat rejection air stream must not be restricted.
2.
Check the data tag for proper electrical requirements. The data tag lists the design voltage and
amperage requirements of the system. Verify that the electrical supply where the system will be
connected has the proper capacity. After noting the above, connect power from a properly
grounded electrical connection. The use of an extension cord is not recommended.
See
for wiring details. (Page 7)
Note: If any unusual noise or vibration is present during the testing procedure, immediately
disconnect the power and inspect the exterior of the unit for the cause of noise or vibration. If
necessary, Contact Ice Qube immediately to determine cause of the noise/vibration.
3.
As soon as power is supplied to the system, both fans will begin to operate.
Note: If the fan speed controller option is selected, one or both fans might not start if the
temperature is below the set point. (Factory set points- Enclosure: 70°F, Ambient: 90°F)
Fan speed controller option available for Ord Loc Only)
4.
After completing the above check point, the Ice Qube TMS is ready to be mounted to your
enclosure.
Preparing the Enclosure
Please read entire section before beginning installation. The Ice Qube TMS has been designed to be light in
weight for easy installation. These units have been designed with a simple stud alignment feature or
hanging tabs to make initial fastening to the enclosure quick and easy. A few modifications must be made
to your enclosure to provide proper air flow, maintain enclosure integrity, and assure secure installation.
Required modifications will vary with Ice Qube TMS model.
1.
Ensure the mounting surface and enclosure will support the weight of the Ice Qube TMS and will
not become unstable causing bodily harm or equipment damage. For units mounted on enclosure
doors, confirm hinges will support the weight of the Ice Qube TMS. Refer to individual
specification drawings for model weights
2.
Using the specification drawing, determine the ideal location to install the Ice Qube TMS on your
enclosure.
3.
Upon deciding the installation location of the Ice Qube TMS on your enclosure, use the cutout
drawing to determine the necessary modifications to your enclosure surface needed to
accommodate mounting of the Ice Qube TMS. An Electronic copy is available at
http://www.iceqube.com/downloads/specification-drawings/
4.
Ensure the Ice Qube TMS will be mounted level.
5.
Ensure the inlet and outlet of the cold air stream will not be restricted by equipment or shelving
within your enclosure.
6.
Check that the air flow of the warm air stream will not be affected or restricted.
Summary of Contents for IQ10000HE
Page 8: ...8 Rev 6 Figure 3 Terminal Cover Figure 4 Terminal Block optional...
Page 13: ...13 Schematic Wiring Diagram Figure 6...
Page 14: ...14 Rev 6 Specification Drawings IQ700HE Figure 7...
Page 15: ...15 Rev 6 IQ800HE Figure 8...
Page 16: ...16 Rev 6 IQ900HE Figure 9...
Page 17: ...17 Rev 6 IQ2200HE Figure 10...
Page 18: ...18 Rev 6 IQ6100HE Figure 11...
Page 19: ...19 Rev 6 IQ7400HE Figure 12...
Page 20: ...20 Rev 6 IQ10000HE Figure 13...
Page 22: ...22 Rev 6 IQ900HE Gasket and Cutout Figure 15...
Page 23: ...23 Rev 6 IQ2200HE Gasket and Cutout Figure 16...
Page 24: ...24 Rev 6 IQ6100HE Gasket and Cutout Figure 17...
Page 25: ...25 Rev 6 IQ7400HE Gasket and Cutout Figure 18...
Page 26: ...26 Rev 6 IQ10000HE Gasket and Cutout Figure 19...
Page 29: ...29 Rev 6 Notes...