![Icegame DODGEBALL Service Manual Download Page 18](http://html1.mh-extra.com/html/icegame/dodgeball/dodgeball_service-manual_3384898018.webp)
18
STEP 9:
Slide the power sub-floor (1E) into the rear channels.
Align the tabs into the slots. WATCH YOUR FINGERS!
AA6212 1/4 X 3/4
black washer
STEP 10:
Secure the power sub-floor (1E) using two AA6584 black Allen bolts and AA6212 black washers.
NOTE: Although all efforts we made to ensure quality in parts, before
installing this panel, inspect the panel for damage to wiring or mounting
holes not fully cleaned out.
X’s 2
AA6584 1/4-20 X 2 black Allen
Summary of Contents for DODGEBALL
Page 7: ...7 Assembly for Steps 1 9 Chapter 1...
Page 16: ...16 Assembly for Steps 9 16 Chapter 2...
Page 22: ...22 Assembly for Steps 17 22 Chapter 3...
Page 28: ...28 Assembly for Steps 23 26 Chapter 4...
Page 33: ...33 Assembly for Steps 28 46 Chapter 5...
Page 44: ...44 Assembly for Steps 47 54 Chapter 6...
Page 49: ...49 STEP 52 Tower harnesses Insert cables from each tower assembly into the bottom holes B...
Page 53: ...53 Assembly for Steps 55 58 Chapter 7 HARDWARE NEEDED AA0655 8 X 3 4 Square pan head QTY6...
Page 54: ...54 Parts Needed Pallet 2 loose 2F...
Page 58: ...58 Chapter 8 Assembly for Steps 59 72...
Page 84: ...84 Tower Covers Part Numbers...
Page 85: ...85 DECAL PART NUMBERS...
Page 91: ...91 DB3277X ball gate Assembly NS1022 P802 black NS1022 P509 blue ZS2015X Actuator...