![Icegame DODGEBALL Service Manual Download Page 15](http://html1.mh-extra.com/html/icegame/dodgeball/dodgeball_service-manual_3384898015.webp)
15
STEP 8:
Slide the upper support onto the
brackets at the front of the game.
Secure the support using two
AA6125 Allen bolts and AA6212
washers from the backside and
secure them with AA6966 nylon
nuts at the front.
TIGHTEN ALL HARDWARE
ONLY WHEN ALL BOLTS ARE
INSTALLED!
AA6966 1/4-20 black
nylon nut
(QTY 4)
AA6125 1/4-20 X 2-1/2 black Allen
(QTY 4)
AA6212 1/4 X 3/4 black
washer
(QTY 8)
Completed
Summary of Contents for DODGEBALL
Page 7: ...7 Assembly for Steps 1 9 Chapter 1...
Page 16: ...16 Assembly for Steps 9 16 Chapter 2...
Page 22: ...22 Assembly for Steps 17 22 Chapter 3...
Page 28: ...28 Assembly for Steps 23 26 Chapter 4...
Page 33: ...33 Assembly for Steps 28 46 Chapter 5...
Page 44: ...44 Assembly for Steps 47 54 Chapter 6...
Page 49: ...49 STEP 52 Tower harnesses Insert cables from each tower assembly into the bottom holes B...
Page 53: ...53 Assembly for Steps 55 58 Chapter 7 HARDWARE NEEDED AA0655 8 X 3 4 Square pan head QTY6...
Page 54: ...54 Parts Needed Pallet 2 loose 2F...
Page 58: ...58 Chapter 8 Assembly for Steps 59 72...
Page 84: ...84 Tower Covers Part Numbers...
Page 85: ...85 DECAL PART NUMBERS...
Page 91: ...91 DB3277X ball gate Assembly NS1022 P802 black NS1022 P509 blue ZS2015X Actuator...