ELEVATION SERIES
ELECTRICAL AND PLUMBING REQUIREMENTS
8
Electrical and Plumbing Requirements
30” CIM SERIES Common Connections
(CIM**3* A)
Air Cooled
Please note: air-cooled units require
6”(152mm) for air intake and exhaust.
A. Ice maker potable water in,
3/8” FPT.
B. Ice maker water out,
3/4” FPT.
C. Hole for electrical connections,
7/8”.
D. Electrical junction box,
7/8”.
(CIM**3* W/R)
Water/Remote Cooled
A. Ice maker potable water in,
3/8” FPT.
B. Ice maker water out,
3/4” FPT.
C. Hole for electrical connections,
7/8”.
D. Electrical junction box,
7/8” (remote).
E. Condenser water in,
3/8” FPT (water only).
Discharge line,
1/2” male quick connect
coupling for pre-charged
line set (remote only).
F. Condenser water out,
1/2” FPT (water only).
G. Liquid Line,
3/8” male quick connect
coupling for pre-charged
line set (remote only).