Due to ICE AIR’s ongoing product development programs, the information in this document is subject to change without notice.
3
Overview
ICE AIR Water Source Heat Pumps are quality units, which should only be installed by a trained professional. Please ensure all sections are
read thoroughly before installing the unit.
Application Note
It is important for heating/cooling systems to be properly sized for each application in order to achieve desired temperature and humidity
levels. It is highly recommended that a professional engineer match the WSHP units you are about to install with the building structure and
climate.
Inspection
1. Check the shipment against the Bill of Lading. Ensure all components are intact upon delivery and free from damage. Note any damage on
the delivering carrier’s Bill of Lading*.
2. The ICE AIR unit(s) arrive prefabricated with an enclosure. Ensure both the unit and the enclosure are
properly attached.
3. Make sure the floor is level in both directions so the unit’s airflow will be aligned. Confirm adequate drainage is available to ensure
adequate and continuous water flow during unit operation.
4. Remove the access panel is BEFORE installing.
5. Verify amperage to the unit(s) is correct and the unit can reach the power supply.
*
Purchaser’s responsibility includes filing all claims with the delivering carrier in a timely fashion.
DISCHARGE GRILL
ENCLOSURE
BASE
COOLING/HEATING CHASSIS
ENCLOSURE FRONT COVER
CONTROL ACCESS DOOR
FAN DECK
UNIT MOUNTED CONTROLS
RETURN PIPE
SUPPLY PIPE